photo of rail damage on Rails on the Bridge Ave. ramps
 
Photo of damaged joint in sidewalk
The railings, both on the bridge (upper photo) and on the Bridge Avenue ramps (lower photo) are being repaired and upgraded to meet current crash-resistance standards.
 
 
Photo of badly damaged joint The bridge deck was badly worn and rutted, and many bridge joint seals were missing, allowing vehicle-contaminates in the storm water to drain directly into the Willamette River below. The bridge deck is being completely replaced and the number of bridge joints is being substantially reduced.
Photo of exposed rebar exposed from pavement wear  Inspections showed the bridge's main cables are generally in good condition, but their corrosion protection is wearing thin.
Picture os inspectors in lift bucket Photo of equipment being used during inspection
Some of the vertical suspension cables  show wear and are being repaired or replaced and repainted to reduce corrosion.
Picture os inspectors in lift bucket Picture os inspectors in lift bucket Photo of crumbled away sidewalk Photo of deteriorated materials
The sidewalks are crumbling away at the joints and from beneath the structure (note exposed rebar, in the second photo from right, above).
 
Return to the St. Johns Rehabilitation project page

 