| U.S. 30/Yeon Paving Project |
|
|
 |
| Project background |
|
A contractor for the Oregon Department of Transportation has completed a $2.9 million project to repave U.S. 30/Yeon Avenue from Nicolai Street (mile post 2) to Kittridge Avenue (mile post 3.9).
Work included removing the top layer of existing asphalt and installing a new asphalt surface. New pavement striping was added. Current substandard sidewalk ramps were also replaced.
** A note about the striping at NW 26th and Yeon: The City of Portland has an upcoming project in the area of NW 26th that would require them to tear up the striping. So as a cost savings measure to the city, we decided it was best not to do the permanent striping until the city's project has been completed.
Traffic Enforcement
City of Portland police conducted photo radar enforcement of work zone traffic laws when construction was taking place. Click here for more information on this pilot program.
|
| Contact |
|
Mike Mason
Community Affairs Coordinator
503.731.8246
Michael.W.Mason@odot.state.or.us
|
|
|
|