Select Language
Search:
Text Size:
A+
A-
A
•
Text Only
•
Northwest Region- Region 2
Department
Transportation Department
Divisions
Central Services
Communications
Driver and Motor Vehicles (DMV)
Highway
Motor Carrier Transportation
Public Transit
Rail
Transportation Development
Transportation Safety
About Us
Contact Us
Traffic and Travel
Projects
News
Maintenance & Permits
Re-Districting / Boundary Changes
I-5 Willamette River Bridge (Eugene/Springfield)
Environmental Assessment
The full text of the EA document is available here:
I-5 WRBP EA Full Document
(pdf, 42.2MB, This file includes figures from Appendix B that were omitted from the original electronic version.)
Individual chapters and sections of the EA document are available below:
Signed Documents
Table of Contents, Acronyms and Abbreviations
Executive Summary
(pages 1-8)
Project Information
(pages 9-18)
Project Alternatives
(pages 19-30)
Affected Environment and Environmental Consequences
(pages 31-101)
Mitigation and Conservation Measures
(pages 102-111)
References
(pages 112-115)
Glossary
(pages 116-117)
Appendix A
– Preliminary Bridge Types
Appendix B
– Baseline Noise Prediction Sites
Appendix B
Figures B-7 through B-11
Appendix C
– List of Technical Reports
Air Quality
Archaeological Assessment of the Eugene Millrace Diversion Dam and Intake
(not included in original EA distribution)
Biology and Threatened and Endangered Species
Geological Resources
Hazardous Materials
Land Use
Noise
Right of Way
Section 6F
Socio-Economics
Visual Quality
Water Resource
Wetlands
Appendix D
– List of Preparers
Appendix E
– Distribution List
Questions
Questions on the EA should be directed to Jim Cox, ODOT NEPA Coordinator, at (503) 986-6612 or
jim.b.cox@odot.state.or.us
.
Page updated: January 02, 2009