This culvert replacement is part of the Pioneer Mountain – Eddyville modernization project. The culvert that carries Simpson Creek under Elk City Road at the intersection of U.S. 20 (about milepost 15.5) is aging and has deteriorated.  The existing 14 foot metal culvert will be removed and replaced with a 28 foot concrete arch. Construction will begin July 7 and is scheduled to be completed in August. The estimated construction cost of the project is $646,183. The work will be done by Knife River Corporation.
 

Public Involvement
To accomplish the replacement as quickly as possible and minimize disruption of highway traffic, crews will work around the clock. Excavation for the larger culvert will encroach on the eastbound travel lane of U.S. 20 at the intersection of Elk City Road. The eastbound travel lane and Elk City Road at U.S. 20 will be closed for the duration of the project. Expect one lane traffic with 24-hour flagging and 10- to 20-minute delays on U.S. 20.  Elk City Road residents can access U.S. 20 through Toledo. 
 
Please check our weekly construction updates for more information during the construction period.
 
A post card was mailed to the communities of Newport, Toledo, Blodgett, Philomath, Lincoln City, and Eddyville on May 22 and a copy of it can be found in the project library.
 

Project Library
News Release (June 25, 2009)
Postcard (May 22, 2009)
Excavation Cross Section
 

Contact
Please contact the Project Manager with questions or comments. Media inquiries should be referred to the Public Information Officer.
 

 
Page updated: July 08, 2009

Click here to go to the Oregon Dept. of Veterans' Affairs outreach contact form

Get Adobe Acrobat ReaderAdobe Reader is required to view PDF files. Click the "Get Adobe Reader" image to get a free download of the reader from Adobe.