This is a pavement preservation project that will grind out the existing roadway and then inlay new asphalt, repaving U.S. 20 from the east end of Philomath to the Highway 99W over-crossing in Corvallis (mile post 51.31 – 55.75).
 
The project will also make guardrail and ADA sidewalk ramp improvements within the project area.
 
Preservation projects maintain existing roads by rehabilitating damaged pavement and upgrading sub-standard roadway features.
 
The contractor is Knife River Inc. out of Tangent, Oregon.
 

Public Involvement
Construction begins June 15, 2009, and paving will cause delays on U.S. 20. Construction crews will work at night to reduce impacts to area traffic.
 
Traffic will be one lane with flaggers during paving operations and construction is estimated to be complete in September.
 
There is a no-work zone between SW 53rd Street and SW Technology Loop, where newer paving already exists.
 
Please check our weekly construction updates for more information.
 
Comments or questions may be directed to Assistant Project Manager Brady Pauls via email or telephone, (541) 757-4211.
 

Project Library
Presentations and Press Releases

Contact
Please contact the Assistant Project Manager with questions or comments. Media inquiries should be referred to the Public Information Officer. 
  • Brady Pauls, Assistant Project Manager, (541) 757-4211
  • Rick Little, Public Information Officer, (541) 726-2442
 

 
Page updated: August 10, 2009

Click here to go to the Oregon Dept. of Veterans' Affairs outreach contact form

Get Adobe Acrobat ReaderAdobe Reader is required to view PDF files. Click the "Get Adobe Reader" image to get a free download of the reader from Adobe.