Central Oregon Road Construction
UPDATE: Week of March 3rd
The Oregon Department of Transportation (ODOT) is continuing to invest in Oregon’s future with roadway improvement projects throughout Oregon’s central region (ODOT Region 4). ODOT is committed to providing safe, efficient transportations systems. The following projects reflect ODOT’s commitment to make improvements as traffic numbers rise and to make the roadways safer and more efficient for drivers:
ALL WORK IS DEPENDENT UPON WEATHER
CROOK COUNTY
OR 126 (Ochoco Highway), MP 18, Prineville
Bridge repair work will take place from 7 p.m. to 5 a.m. Monday, March 6 to Friday, March 10. One lane of traffic will be closed, and flaggers will direct traffic. Expect minor delays.
DESCHUTES COUNTY
OR 126 (McKenzie Highway), MP 111, Redmond
Highland Avenue is one way eastbound and Glacier Avenue is one way westbound. Ninth Street is one way northbound and 11th Street is one way southbound, between Highland and Forest avenues.
Crews are working to install the city of Redmond’s sewer line project along the north side of Highland Avenue.
On Tuesday, March 7, 11th Street will be closed on the north side of Highland Avenue for the storm line work. Glacier Avenue will provide access to and from the businesses on 11th Street, between Glacier and Highland avenues. The signal at Glacier Avenue and 11th Street will be turned off and flaggers will direct traffic.
Sidewalks along the north side of Highland Avenue are closed. Pedestrians should be aware that the sidewalks on the south side of the road will be closed in the next few weeks and they will need to find alternate routes through the area.
Intermittent closes of streets and alleys between Sixth and 12th streets may take place. Local business access will be maintained.
US 97 (The Dalles – California Highway), MP 113.9, north of Terrebonne
Paving of the shoulders on US 97, 10th Street and Ditch Rider Road has been postponed until the weather improves. Crews may be working in the area. No delays.
Wimp Way at US 97 in Terrebonne is temporarily closed to through traffic to facilitate replacement of the Burlington Northern Santa Fe (BNSF) Railroad Bridge and to ensure motorist safety during construction at this intersection.
This bridge is located about one mile north of Terrebonne on US 97 at milepost 113.9. During the first phase of construction, crews will construct a new, two-lane bridge with 10-foot shoulders to the west of the existing bridge. Traffic will remain on the existing bridge during construction. Motorists will be routed to the new bridge in fall 2005. Following this traffic switch, crews will remove the existing bridge.
Negus Way, Redmond
Bridge work continues at Negus Way, from North Canal Boulevard to the east side of the railroad tracks. Crews are constructing retaining walls and bridge supports.
Negus Way is closed between North Canal Boulevard and NE 5th St.
Motorists are advised to seek alternate routes around the closure area, including the usage of the newly completed NE 9th Street extension location between Negus Avenue and Hemlock Avenue. Patrons of Xtreme Fitness will use the newly completed NE Second Street bridge to reach the business.
US 97 (The Dalles – California Highway), MP 152-154, at South Century Drive, near Sunriver
Utility relocation will take place during the week, as crews prepare to start work on the new Sunriver Interchange. No delays.
A full diamond interchange will be built to improve safety and operations at the existing intersection and to accommodate an increase in projected traffic. The interchange will consist of two-lane bridges for both north- and southbound traffic on US 97. South Century Drive will go under the two bridges, which are separated by a 120-foot vegetative median.
JEFFERSON COUNTY
US 97 (The Dalles – California Highway), MP 92 and US 26 (Warm Springs Highway), MP 116, Madras
Crews are performing cleanup work this week. No delays.
The US 97/US 26 Willow Creek Bridge - Depot Road Project reconfigured and signalized the intersection of US 97 and US 26 near the north city limits of Madras. This project provides safety and enhancement improvements in the City of Madras on US 26 / US 97 from the existing Willow Creek Bridges (MP 92.12) to the intersection of N.E. Plum Street (MP 91.84) and pavement improvements on U.S. 26 between N.E. Plum Street and N.E. Depot Street (MP 116.80).
US 26 (Warm Springs Highway), MP 116.36 – 116.80, West of Madras
Wildish Standard Paving Company is working to replace the existing, three lane Burlington Northern Santa Fe Rail Road Bridge, west of Madras, with a new, wider, three-lane Bridge.
A final deck pour is scheduled for Monday, March 6. Motorists should expect a single lane closure, controlled by flaggers. between either 10 a.m. to noon or 7 p.m. to 9 p.m. to allow for the deck pour. Expect up to nine minute delays.
Construction activities will take place in the area Monday through Friday, 7 a.m. to 5 p.m. with intermittent night and weekend work possible. Motorists can expect delays of less than 15 minutes when traveling through this work zone. This project is expected to be complete in early 2006.
KLAMATH COUNTY
Tingley Lane (Midland Highway), MP 1.34, Klamath Falls
The Tingley Lane Bridge over the Lost River diversion canal is now open to one lane, controlled by stop signs. Yield to oncoming traffic and be aware of loose gravel. The contractor for the Oregon Department of Transportation will replace the current aging, wood structure with a concrete bridge.
The bridge was closed in summer 2004 after damage was discovered in the bridge deck. It was opened later that year, but restricted to one lane, with a stop sign at each end. The new structure will be a two-span concrete slap bridge, 36 feet wide and 125 feet long. It will be able to handle modern-day loads and truck traffic.
OR 66 (Greensprings Highway) MP 43.48-44.08, west of Klamath Falls
Crews are working on the Spencer Bridge over the Klamath River. No delays anticipated.
US 97 (The Dalles-California Highway) MP 241, Spring Creek Hill
This project is in winter shutdown. Equipment may be in the area.
US 97 (The Dalles-California Highway) MP 243.9, Spring Creek Bridge
This project is in winter shutdown. Equipment may be in the area.
US 97 (The Dalles-California Highway) MP 263.1, Barkley Springs Bridge
Clean-up work is being performed in the area. No delays expected.
US 97 (The Dalles-California Highway) MP 265.6, Algoma Bridge
This project is in winter shutdown. Equipment may be in the area.
Algoma Road is still closed.
US 97 (The Dalles – California Highway), MP 274.73, Klamath Falls
Traffic has been switched to the new bridge structure over California Avenue. Crews are performing cleanup work. Intermittent delays possible.
California Avenue is currently closed to through traffic between North 1st Street and Conger Avenue to facilitate construction of the new bridge. Motorists are advised to seek alternate routes around the area.
US 97 (Dalles - California Highway), MP 275.8, Klamath Falls
Crews from Hamilton Construction Company are working to replace the US 97 Bridge over Greensprings Drive. One lane of traffic is opened in each direction. No delays expected.
OR 39 (Klamath Falls-Malin Highway) at OR 140 (South Klamath Falls Highway) MP 1.58-2.04, Klamath Falls
Crews will be installing pipe and doing ditch work. Flaggers may control motorists’ movements at times. Minor delays possible
.
OR 140 (Lake of the Woods Highway), MP 50.81 to MP 57.06, at Doak Mountain, west of Klamath Falls
Work has been stopped for the winter. No delays expected.
LAKE COUNTY
OR 140 (Warner Highway) MP 17.39 – 18.50, US 395 (Freemont Highway) MP 128.57 – 142.64
This project is in winter shutdown. No delays.
This modernization project will realign and reconstruct Highway 140 to eliminate four curves, install safety features and replace the Parsnip Creek Bridge (MP 18.2) with a box culvert on the Warner Highway. Along, US 395, contractor crews will add two to three inches of new pavement on the Freemont Highway, north of Lakeview. This paving project will improve the aging highway surface in the area and includes upgrades to guardrail and constructing new mailbox turnouts. The project is anticipated to be finished in summer 2006.
For local and statewide construction information visit www.tripcheck.com or dial 5-1-1.