Text Size: A+| A-| A   |   Text Only Site   |   Accessibility
ODOT Logo
News
5/8/2006
For More Information Contact:
Heidi Hiaasen, ODOT Project Communications, 541-388-6178
Julianne Repman, ODOT Public Information, 541-388-6224
 
Central Oregon Road Construction
UPDATE: Week of May 8th
    
 
The Oregon Department of Transportation (ODOT) is continuing to invest in Oregon’s future with roadway improvement projects throughout Oregon’s central region (ODOT Region 4). ODOT is committed to providing safe, efficient transportations systems. The following projects reflect ODOT’s commitment to make improvements as traffic numbers rise and to make the roadways safer and more efficient for drivers:
ALL WORK IS DEPENDENT UPON WEATHER
 
CROOK COUNTY
OR 126 (Ochoco Highway), MP 17.9
, Prineville
Traffic has been switched to the construction configuration. Crews are excavating and preparing for bridge construction. Traffic has been shifted. Minimal traffic delays possible.
 
DESCHUTES COUNTY
Maintenance crews will be cleaning drains on Bend-area highways during the weeks of May 8, 15 and 22. Crews will be working between 8 a.m. and 3:30 p.m.  Highways include the Bend Parkway (US 97) and US 20 on Third Street and Greenwood Avenue. Expect minor delays.


OR 126 (McKenzie Highway), MP 93-97, junction of US 20
Crews for the Oregon Department of Transportation will begin paving a section of OR 126 between Sisters and Redmond on Monday, May 8. The project is scheduled to be finished by the end of May.  

During the work, crews will perform grinding, paving and shoulder and guardrail work from the intersection of OR 126 and US 20 (mile point 93), to four miles east of the junction (mile point 97). Within the four mile of the project limits, motorists on OR 126 should expect up to 15-minute delays during the hours of 7 a.m. and 11 p.m. Motorists on US 20 should expect up to 15-minute delays between 6 and 11 p.m.

Motorists are asked to reduce speed and use caution while driving through the work zone.
 
OR 126 (McKenzie Highway), MP 111, Redmond
Highland Avenue is one way eastbound and Glacier Avenue is one way westbound. Ninth Street is one way northbound and 11th Street is one way southbound, between Highland and Forest avenues.
 
Crews are working along the north side of Highland Avenue, working on curbs and sidewalks. Expect temporary closures of alleys and driveways throughout the week. The north side of Highland is scheduled to be paved in mid May.
 
Sidewalk and road work continue on 11th Street, between Highland Avenues and Veterans Way. Expect intermittent closure and flagging during daytime operations.
 
Crews are reconstructing the signal at Ninth Street and Highland Avenue. Expect intermittent delays when the old signal poles are removed.
 
Sidewalks along the north and south side of Highland Avenue are closed during construction. Pedestrians are asked to find alternative routes through the area.
 
US 97 (The Dalles – California Highway), MP 113.9, north of Terrebonne
Nighttime paving, striping, and guardrail installation work on US 97 at the new bridge over the BNSF railroad at Terrebonne is scheduled for Tuesday, May 16 through Thursday, May 18 and from Monday, May 22 through Friday, May 26.  Motorists should expect a single lane closure from 7 p.m. to 6 a.m. to facilitate the final roadway operations. Crews will also pave the shoulders on US 97, 10th Street, and Ditch Rider Road.  Flaggers will control alternating one-way traffic on US 97 and motorists access to 10th Street and Ditch Rider Road.
 
Wimp Way at US 97 in Terrebonne is temporarily closed to through traffic to facilitate replacement of the Burlington Northern Santa Fe (BNSF) Railroad Bridge and to ensure motorist safety during construction at this intersection. 
 
This bridge is located about one mile north of Terrebonne on US 97 at milepost 113.9.  During the first phase of construction, crews will construct a new, two-lane bridge with 10-foot shoulders to the west of the existing bridge.
 
Negus Way, Redmond
Bridge work continues at Negus Way, from North Canal Boulevard to the east side of the railroad tracks. Crews are constructing retaining walls and bridge supports. No delays expected, but motorists are asked to be cautious of trucks and equipment in the area.
      
Negus Way is closed between North Canal Boulevard and NE 5th St
Motorists are advised to seek alternate routes around the closure area, including the usage of the newly completed NE Ninth Street extension location between Negus Avenue and Hemlock Avenue.
 
US 97 (The Dalles – California Highway), MP 152-154, at South Century Drive, near Sunriver
For the week of May 8-12, earthwork and blasting activities continue this week.  Blasting may take place from 9:30 to 11 a.m. on Tuesday, May 9. Expect delays up to 10 minutes during this time. No other restrictions are expected. 
 
A full diamond interchange will be built to improve safety and operations at the existing intersection and to accommodate an increase in projected traffic. The interchange will consist of two-lane bridges for both north- and southbound traffic on US 97. South Century Drive will go under the two bridges, which are separated by a 120-foot vegetative median.
 
GILLIAM COUNTY
Interstate 84 (Columbia River Highway), MP 60-130
, between Hood River and the John Day River Bridge
Maintenance crews will be stripping the interstate from May 8 to 11, during daytime hours. Expect minor delays during this mobile operation.

JEFFERSON COUNTY
US 26 (Warm Springs Highway), MP 116.36 – 116.80
, West of Madras
Wildish Standard Paving Company is working to replace the existing, three lane Burlington Northern Santa Fe Rail Road Bridge, west of Madras, with a new, wider, three-lane Bridge.
 
Night crews are scheduled to perform striping, guardrail and fence installation work from Monday, May 8 through Thursday, May 11.  Motorists should expect a single lane closure from 7 p.m. to 6 a.m. to facilitate the final roadway operations.  Flaggers will control alternating one-way traffic and drivers should expect up to 10-minute delays. 
 
KLAMATH COUNTY
Tingley Lane (Midland Highway), MP 1.34
, Klamath Falls
The Tingley Lane Bridge over the Lost River diversion canal is now open to one lane, controlled by stop signs. Yield to oncoming traffic and be aware of loose gravel. The contractor for the Oregon Department of Transportation will replace the current aging, wood structure with a concrete bridge.
 
The bridge was closed in summer 2004 after damage was discovered in the bridge deck. It was opened later that year, but restricted to one lane, with a stop sign at each end. The new structure will be a two-span concrete slap bridge, 36 feet wide and 125 feet long. It will be able to handle modern-day loads and truck traffic.
 
OR 66 (Greensprings Highway) MP 43.48-44.08, west of Klamath Falls
Crews are working on the Spencer Bridge over the Klamath River. No delays anticipated.
 
US 97 (The Dalles-California Highway) MP 241, Spring Creek Hill
Excavation activities resume this week. Traffic regulated by flaggers. Expect delays.
 
US 97 (The Dalles-California Highway) MP 243.9, Spring Creek Bridge
Bridge work has restarted. Expect minor delays.
 
US 97 (The Dalles-California Highway) MP 258 to MP 262
Crews will be in the area to widen the roads and perform rock wall work. Traffic may be controlled by flaggers of pilot car. Expect minor delays.
 
US 97 (The Dalles-California Highway) MP 263.1, Barkley Springs Bridge
Bridge work has restarted. Expect minor delays.
 
US 97 (The Dalles-California Highway) MP 265.6, Algoma Bridge
Bridge work resumes. Expect minor delays. Traffic regulated by flaggers at times
Algoma Road is still closed.
 
US 97 (The Dalles – California Highway), MP 274.73, Klamath Falls
Traffic has been switched to the new bridge structure over California Avenue. Crews continue to cleanup the work site.
 
California Avenue has been reopened to traffic between North First and Conger Street. Intermittent closures may be possible.
 
US 97 (Dalles - California Highway), MP 275.8, Klamath Falls
Crews from Hamilton Construction Company are performing cleanup work at the US 97 Bridge over Greensprings Drive. One lane of traffic is opened in each direction. No delays expected.
 
OR 39 (Klamath Falls-Malin Highway) at OR 140 (South Klamath Falls Highway) MP 1.58-2.04, Klamath Falls
Crews will be installing pipe and signs and doing ditch work. Flaggers may control motorists’ movements at times. Minor delays possible.
 
OR 140 (Lake of the Woods Highway), MP 50.81 to MP 57.06, at Doak Mountain, west of Klamath Falls
Work has been stopped for the winter. No delays expected.
 
LAKE COUNTY
OR 31 (Fremont Highway) MP 46.6-46.9
, one mile west of Silver Lake
Crews are working to replace the narrow, wood bridge with a new concrete structure. No delays expected during the week.
 
OR 140 (Warner Highway) MP 17.39 – 18.50, US 395 (Freemont Highway) MP 128.57 – 142.64
This project is in winter shutdown. No delays.
 
This modernization project will realign and reconstruct Highway 140 to eliminate four curves, install safety features and replace the Parsnip Creek Bridge (MP 18.2) with a box culvert on the Warner Highway. Along, US 395, contractor crews will add two to three inches of new pavement on the Freemont Highway, north of Lakeview. This paving project will improve the aging highway surface in the area and includes upgrades to guardrail and constructing new mailbox turnouts. The project is anticipated to be finished in summer 2006.
 
For local and statewide construction information visit www.tripcheck.com or dial 5-1-1.
##ODOT##

 
Page updated: February 04, 2007

Get Adobe Acrobat ReaderAdobe Reader is required to view PDF files. Click the "Get Adobe Reader" image to get a free download of the reader from Adobe.