U.S. 26 @ Dover Lane

Key Project Components

 
  • Realign Dover Lane at the intersection of U.S. 26
  • Widen shoulders on U.S. 26 near the intersection with Dover Lane
  • Install new signs on U.S. 26 and Dover Lane near the intersection
  •  
Vicinity Map                                             Project Information Paper    
 
Keep Yourself Informed
Sign up for email alerts or receive weekly updates once construction begins. You will be asked to set up an account, which is free and simple. The email address you provide will only be used for this project. Simply click on the envelop and sign up. 
                                

Why this project is needed

U.S. Highway 26 is a critical part of the State’s transportation system.  It is an important freight route that supplies goods and services to central Oregon.  Keeping highways safe and traffic moving are critical parts of the mission for the Oregon Department of Transportation.

Problem Description
The U.S. 26 and Dover Lane intersection has been a top 10% Safety Priority Index System (SPIS) site since 2007. It was a top 10% in 2007 and a top 5% in 2008 and 2009. In 2009 it was also the highest ranked SPIS site in central Oregon. ODOT has implemented several safety measures at the intersection. Some of the improvements included enlarging stop signs, improving sight distance and widening the gravel shoulder on Dover Lane.  The improvements have not made any apparent effect on reducing the crash rates at the intersection. 

In 2010 a road safety audit was conducted for the intersection.  Key findings from the audit include:
  • The skew angle of Dover Lane towards U.S. 26, and blind spots caused by a vehicles’ ‘A’ pillar are key causal factors in the reported crashes.
  • Angle crashes represent approximately 90% of all crashes.
  • Motorists on U.S. 26 are not likely to notice the intersection with Dover Lane.  Likewise, motorists on Dover Lane are not seeing the stop signs when approaching U.S. 26.

How ODOT plans to address the problems

The main component of this safety improvement project will be to reduce the skew angle of Dover Lane to U.S. 26.  This will improve the ability of motorist on Dover Lane to see vehicles traveling on U.S. 26.
 
Shoulders on U.S. 26 will be widened to eight feet near the intersection of Dover Lane.   The shoulder widening, durable striping and additional signage will create awareness of the intersection with Dover Lane.  Widening, pavement markings and additional signage is also planned on Dover Lane.
 
In designing the safety improvement, care was taken to limit impacts to neighboring residents and to provide them safe access to Dover Lane.

Key Project Milestones

 
Develop Preliminary Plans​ ​2013                     ​                                        ​
Right of Way Acquisition​ ​2013-2014
​Bid Opening April ​2014
​Construction ​2014
 

Estimated Project Cost

$860 thousand

Project Contacts

 
Name
Title
Office Phone
Email Address
Katie Parlette
Project Leader
(541) 388-6037
Rich Black
Jefferson County Engineer
(541) 475-4462
Gary Farnsworth
Area Manager
(541) 388-6071
Rex Holloway
Community Liaison
(541) 388-6178