Number
|
Title
|
Effective Date |
Last Updated
|
Technical Services
|
| TSB08-01(B) |
As Constructed Plans
|
06/01/2008 |
New
|
| TSB08-02(B) |
Design Criteria Document |
09/01/2008 |
New
|
| TSB08-03(B) |
Vertical Clearance Standards
|
09/01/2008 |
New
|
| TSB09-01(B) |
IR Program |
02/01/2009 |
New
|
| TSB09-02(B) |
Project-specific Special Provisions |
02/01/2010 |
New
|
Access Management
|
| AM07-01(B) |
Deposit Made in Lieu of a Bond for a Permit to Construct a Road Approach |
06/14/2007 |
07/15/2009 |
| AM07-02(B) |
Deposits for a Permit to Construct a Temporary Road Approach |
06/14/2007 |
07/15/2009 |
| AM 10-01(B) |
Filing, Distribution, and Transfer of Approach Road Permit Records |
07/01/2010 |
New
|
| AM11-01(B) |
Non-traversable medians as mitigation for private approaches on highways with less than or equal to 5,000 AADT |
03/15/2011 |
New
|
Geo-Environmental
|
| GE07-01(B) |
FHWA Limitations on PS&E Exception Letters |
05/09/2007 |
06/24/2009 |
GE07-03(B)
|
Underground Injection Control (UIC) Systems |
02/10/2006 |
08/28/2009 |
| GE07-04(B) |
Mitigation site monitoring, modifications, and release procedures |
09/20/2007 |
10/06/2009 |
| GE08-01(B) |
Consultant Qualifications for Performing ODOT Biological Assessment
|
04/23/2008 |
Supersedes GE2005-01 |
| GE08-03 (B) |
Public Involvement Procedures for Federal-Aid Project Development |
12/09/2008 |
New
|
| GE08-04(B) |
Designating Construction Staging and Disposal Sites |
12/09/2008 |
New
|
| GE09-01(B) |
Geo-Hydro-Environmental Design Drawing Order and Sheet Numbering
|
03/01/2009 |
New
|
| GE09-02(B) |
Stormwater Management Program
|
01/27/2009 |
Supersedes GE07-02(B) |
| GE09-03(B) |
Turbidity monitoring for permitted in-water work and construction related discharges
|
01/30/2009 |
New
|
| GE09-04(B) |
Biology Mitigation Monitoring Standards |
04/01/2009 |
New
|
| GE09-05(B) |
Categorical Exclusion (CE) Closeout Process, Guidance, and Documentation
|
03/24/2009 |
New
|
| GE09-07(B) |
Determining Jurisdictional Boundaries on Non-Tidally Influenced, Freshwater Streams and Feature
|
08/10/2009 |
New
|
| GE09-08(B) |
Drainage Field Markers |
11/25/2009 |
Supersedes
GE09-06(B)
|
| GE10-01(B) |
Stormwater Treatment and Storage Facility Field Markers
|
05/01/2010 |
New
|
| GE10-02(B) |
Hydraulics/Stormwater Report Management
|
05/01/2010 |
New
|
| GE11-01(B) |
Evaluating Compensatory Mitigation site locations and Site Restoration to minimize conflicts with highway operations and maintenance |
07/18/2011 |
New
|
| GE11-02(B) |
Environmental Non Compliance Incident Reporting |
07/21/2011 |
New
|
Right of Way
|
| RW06-01(B) |
Process for the Disposal of Surplus Property |
08/01/2006 |
11/06/2008
|
| RW07-01 (B) |
Offer-Benefit Letter (Rescinding) |
03/12/2007 |
03/20/2009
|
| RW08-01(B) |
Relinquishment of Project Right of Way to Local Public Agency
|
05/15/2008 |
07/22/2009 |
| RW08-02(B) |
Abandonment of Former Right of Way to Abutting Property Owners
|
05/15/2008 |
07/22/2009 |
Traffic-Roadway Engineering
|
| Traffic |
TR05-10(B)
|
ITS Design Responsibility
|
09/01/2005 |
12/17/2009 |
| TR06-03(B) |
Speed Limit Signing in School Zones
|
07/01/2006 |
08/18/2008 |
| TR07-01(B) |
ODOT Traffic Signal Policy for Protected Green Clear-out at Highway-Railroad Grade Crossing |
4/10/2007 |
07/27/2009
|
| TR07-06(B) |
Decorative Luminaire Support Design Requirements |
12/01/2007 |
12/30/2009
|
| TR07-07(B) |
Highway Safety Engineering "Quick Fix" Program |
09/20/2007 |
09/14/2009 |
TR07-10(B)
|
Illumination Design |
09/28/2007 |
Supersedes
TR05-11
----------
Validated
12/18/2009
|
| TR08-01(B) |
2070 Traffic Signal Controller |
01/01/2009 |
New
|
| TR09-02(B) |
Project Identification Sign for ODOT Economic Stimulus Projects |
04/07/2009 |
Supersedes
TR09-01(B)
|
| TR10-01(B) |
Implementation of Douglas Fir No. 1 Wood Sign Posts |
01/01/2010 |
New
|
| Roadway |
| RD07-01(B) |
2004 AASHTO Green Book
|
02/12/2007 |
11/09/2009
|
| RD07-05(B) |
Salvaging Features and Excess Materials Associated with Transportation Projects by Contract Specification |
07/01/2007 |
09/02/2009 |
| RD07-09(B) |
Revision to ADA Sidewalk Ramp Section of Urban 3-R Preservation Strategy
|
01/01/2008 |
New
|
| RD08-01(B) |
Median width and barrier warrant on the Interstate Freeway System. |
06/01/2008 |
New
|
| RD08-03(B) |
Channelization & Intersection details |
06/01/2008 |
New
|
| RD08-04(B) |
Design Exception Update Interchange Spacing Standards |
08/01/2008 |
New
|
| RD08-05(B) |
Single Function Standard for Projects - Highway Design Manual |
12/12/2008 |
New
|
| RD09-01(B) |
Superelevation Development Standards - Highway Design Manual |
11/01/2009 |
New
|
| RD09-02(B) |
Freeway Median Closure Warrant - Highway Design Manual |
11/01/2009 |
New
|
| RD09-03(B) |
Project Stationing |
02/01/2010 |
New
|
| RD09-04(B) |
Note and Label Capitalization on Plan Sheets |
11/30/2009 |
New
|
| RD09-05(B) |
Design Speed |
03/01/2010 |
New
|
| RD09-06(B) |
Update Signature Block on Title Sheet |
12/18/2009 |
Supersedes RD08-02(B) |
| RD10-01(B) |
Use of Non Energy-Absorbing Guardrail Terminals - Update of Highway Design Manual, Section 5.8 |
09/01/2010 |
New
|
| RD10-02(B) |
Roundabouts - Highway Design Manual (HDM) |
07/01/2010 |
New
|
RD10-03(B)
Attach A&B |
ADA Design Exception Process - Highway Design Manual (HDM) |
11/09/2010 |
New
|