The Analysis Procedures Manual (APM) provides the current methodologies, practices and procedures for conducting long term analysis of Oregon Department of Transportation (ODOT) plans and projects.
Appendix A - Resources Appendix B - Glossary Appendix C - ODOT Traffic Engineering Authority Appendix D - Sample ODOT 16-Hour Intersection Count and Tube Count Appendix E - Procedure for Analysis and Design of Weaving Sections, A User's Guide
Appendix F - Example Narratives
F.1 Downtown Brookings-US101 Transportation Solutions Project (Example of a
System Project) (Report) (Report Appendices)
F.2 Constitution Area Refinement Study (Example of a Point Project)
F.3 US 199 Expressway Upgrade Project (Example of a Linear Project)
Appendix G - Example Tech Memos
G.1 Fern Valley Interchange Existing Conditions Tech Memo (Report) (Figures)
G.2 Constitution Area Refinement Study Future No-Build Tech Memo (Report) (Figures)
G.3 Grandview - Nels Anderson Traffic Analysis Technical Memo (Report) (Figures)
Page updated: August 06, 2008
Adobe Reader is required to view PDF files. Click the "Get Adobe Reader" image to get a free download of the reader from Adobe.