Go Oregon! Park Projects
|
|
|
Article Content
|
 |
| Champoeg A-loop Restroom/Shower Replacement and Site Preparation |
|
Work Description
|
|
Prebuilt restrooms delivered.
|
|
|
Unloading the restrooms from the delivery trucks.
|
|
|
Placing the restrooms on the prepared site.
|
Champoeg State Heritage Area
St. Paul, OR
Marion County
Stimulus Amount: $335,000
Other Funds: $32,000
Total: $367,000
Restroom/Shower Building in A-loop Campground
-
Demolish single-story restroom including foundation and surrounding sidewalk. Disconnect utilities (water, sewer, electric and propane) and protect for future reconnection.
-
Prepare site for new restroom by excavating soft/unstable material and replacing with structural fill.
-
Re-connect all utilities (water, sewer, electric and propane) throughout the prebuilt, OPRD purchased restroom/shower building; install OPRD purchased 400 amp control panel and enclosure; connect all electrical utilities to control panel and enclosure.
Current status: Project Complete
Last update: June 9, 2009
Contact:
Bob Reitmajer, OPRD Engineering Manager
503 986-0753