Bullards Beach Pavement Overlay
Work Description

Completed road at Bullards Beach State Park 
Completed pavement on the entrance road.
Bullards Beach State Park    
Bandon, OR
Coos County
Stimulus Amount: $100,000
Other Funds: $57,700
Total: $157,700
Pavement Overlays
  • Construct a 2” AC pavement overlay on the existing entrance road, B-Loop campsite pads, and possibly the eastern most day-use parking lot.
  • Excavate existing road base. No excavation beyond the aggregate base material below the AC pavement surface unless authorized. No work shall extend down to a grade level that was not made when the road, parking lot, or campsite pads were constructed. 
  • Paint traffic stripes and legends.
Current status: Project Complete
Last update: June 10, 2009
Bob Reitmajer, OPRD Engineering Manager
503 986-0753