Text Size:   A+ A- A   •   Text Only
Find     
Site Image
Go Oregon! Park Projects
Bullards Beach Pavement Overlay
Work Description
 

Completed road at Bullards Beach State Park 
Completed pavement on the entrance road.
Bullards Beach State Park    
Bandon, OR
Coos County
 
Stimulus Amount: $100,000
Other Funds: $57,700
Total: $157,700
 
Pavement Overlays
  • Construct a 2” AC pavement overlay on the existing entrance road, B-Loop campsite pads, and possibly the eastern most day-use parking lot.
  • Excavate existing road base. No excavation beyond the aggregate base material below the AC pavement surface unless authorized. No work shall extend down to a grade level that was not made when the road, parking lot, or campsite pads were constructed. 
  • Paint traffic stripes and legends.
 
Current status: Project Complete
Last update: June 10, 2009
 
Contact:
Bob Reitmajer, OPRD Engineering Manager
503 986-0753
 
Go Oregon! logo 
Statewide Go Oregon! information