Applicant
|
Project Name
|
Application
Number
|
ART Funding Recommendations
|
Recommended
Funding Conditions
|
Project
Type
|
| City of Cottage Grove |
Effluent Re-Use Feasibility Study |
|
Do Fund:
High @ $24,500
|
|
R
|
| City of Veneta |
Conservation of Backwash Water |
|
Do Fund:
High @ $10,500
|
Do not fund development of final designs |
C
|
Central Oregon
Irrigation District |
I-Lateral Water Conservation Feasibility Study |
|
Do Fund:
High @ $11,000
|
|
C
|
| Baker Valley Soil & Water Conservation District / Smith Ditch District Improvement Company |
Smith Ditch Water Delivery Conservation Project |
|
Do Fund:
High @ $25,000
|
|
C
|
| City of Medford, Water Reclamation Division |
Water for Irrigation, Streams and Economy (WISE) |
|
Do Fund:
High @ $30,000
|
Only fund water distribution and on-farm irrigation conservation |
C
|
| Klamath Basin Rangeland Trust |
Planning study for the establishment of a water transaction program in the Upper Klamath Basin |
|
Do Fund:
High @ $71,500
|
|
C
|
| Grande Ronde Model Watershed |
Union and Wallowa Counties Watershed Storage |
|
Do Fund:
High @ $51,500
|
Limit funding to study of the Upper Grande Ronde Basin and Upper Catherine Creek Basin |
B
|
| Mosier Watershed Council |
Mosier Aquifer Recovery Feasibility Study |
|
Do Fund:
High @ $167,224
|
|
B
|
| Deschutes River Conservancy / North Unit Irrigation District |
North Unit Irrigation District Main Canal Conservation Project Design |
|
Do Fund:
High @ $193,874
|
Do not fund Task 7: Project design |
C
|
| City of Rockaway Beach |
Water Impoundment Relocation Feasibility Study |
|
Do Fund:
High @ $14,500
|
Require analysis of water right issues |
A
|
| City of Damascus |
East Damascus Regional Water Reuse and Wastewater Management Feasibility Study |
|
Do Fund:
High @ $75,000
|
|
R
|
| Polk County |
Lincoln/Polk County Regional Water Source Development |
|
Do Fund:
High @ $180,000
|
|
A
|
| East Valley Water District |
Drift Creek Storage Project |
|
Do Fund:
High @ $272,581
|
Do not fund the following three tasks: Pre-construction engineering/economic feasibility;
Analysis of water delivery system [previously funded by OWSCI]; Design of mitigation strategies (fish passage) |
A
|
| City of Port Orford |
Hubbard Creek Impoundment Expansion Project |
|
Do Fund:
High @ $100,000
|
|
A
|
| City of Dallas |
Aquifer Storage and Recovery Optimization/Expansion Studies |
|
Do Fund:
Medium @ $74,600
|
|
B
|
| City of Ashland |
Right Water Right Use Planning Study |
|
Do Fund:
Medium @ $177,750
|
Do not fund the last four tasks: Develop justification for the preferred alternative; Develop final report and present to the City Council; Coordinate with Ad Hoc Water Reuse and Conservation Task Force; Report to the Ashland City Council every 6 months |
C & R
|
| City of Tigard / Clean Water Services |
Tigard-Area Water Reuse Study |
|
Do Fund:
Medium @ $53,000
|
Do not fund tasks 9, 10, 11: Develop implementation plan; Identify permit requirements; Identify funding sources |
R
|
| Eagle Point Irrigation District / Medford Water Commission |
Willow Lake / Big Butte Creek Enhancement Project |
|
Do Fund:
Medium @ $75,000
|
|
A
|
| City of Bend |
Long-Term Water Supply Alternatives Analysis Conservation Project |
|
Do Fund:
Contingent on
Adequate Funding
|
If funds are available, fund Task 9: Efficiency and Conservation Evaluation only (for $18,000) |
C
|
| Middle Fork Irrigation District |
Laurance Lake Additional Reservoir Storage |
|
Do Fund:
Contingent on
Adequate Funding
|
|
A
|
| City of Hillsboro / City of Beaverton |
Water Sense Rebate Feasibility Study |
|
Do Fund:
Contingent on
Adequate Funding
|
|
C
|
| Kerns Rainbow Ranch, Inc. |
Surface Water Storage Assessment |
|
Do Fund:
Contingent on
Adequate Funding
|
If funds are available, fund Tasks 1-7 only (for $46,000); do not fund Tasks 8-11 (Preliminary design review and approval; Begin permit applications for selected sites; Design at 75% for selected sites; Approve designs of selected sites) |
A
|
| Lower Powder Irrigation District |
Keating Valley Water Conservation Assessment |
|
Do Fund:
Contingent on
Adequate Funding
|
|
C
|
| Pacific Hydro-Geology Inc |
Mt. Angel Area Aquifer Storage and Recovery Feasibility Study |
|
Do Fund:
Contingent on
Adequate Funding
|
|
B
|
| City of Sisters |
Water Management and Conservation Plan |
|
Do Not Fund
|
|
C
|
| Malheur County Soil and Water Conservation District |
Owyhee / Malheur LIDAR Assistance |
|
Do Not Fund
|
|
C
|
| City of Dallas |
Wastewater Reuse Project |
|
Do Not Fund
|
|
R
|
| Sunriver Environmental, LLC / Deschutes County |
South County Area Reuse Project |
|
Do Not Fund
|
|
R
|
| Baker County: Powder Basin Water & Stream Health Committee |
Water & Stream Health
Feasibility Study -
Tasks 1, 2, 3 |
|
Do Not Fund
|
|
A
|
| City of Florence |
Water Management and Conservation Plan |
|
Do Not Fund
|
|
C
|
| Joint Water Commission |
Joint Water Commission Aquifer Storage and Recovery Feasibility Study |
|
Do Not Fund
|
|
B
|
| City of Corvallis |
Wastewater Reclamation Plant Water Recycling Project |
|
Do Not Fund
|
|
R
|
| Heceta Water District |
Water Management and Conservation Plan |
|
Do Not Fund
|
|
C
|
| Calapooia Watershed Council |
Calapooia River-Sodom Ditch Water Resource Conservation and Management Project |
|
Do Not Fund
|
|
C
|
| Metropolitan Wastewater Management Commission |
Eugene/Springfield Regional Water Reclamation Recycled Water Implementation |
|
Do Not Fund
|
|
R
|