Supplement,Institution,Consultant,Project Name,Contract $,Date,MWESB,Category UO-09-P-176-548,University of Oregon,Opsis Architecture,UO School of Law Alternative Dispute Resolution Center Programming Study,"10,860.00","July 1, 2010",NO, OSU-09-P-178-549,Oregon State University,"CSE Engineering, Inc.",Plageman Hall Bike Shelter Structural Engineering,"1,300.00","July 6, 2010",NO, PSU-09-P-47-550,Portland State University,Gazley Plowman Architects,CAMPUSWIDE EMERGENCY EVACUATION MAPS,"16,340.00","July 6, 2010",NO, UO-09-P-301-551,University of Oregon,Cameron McCarthy Gilbert & Scheibe,Alumni Center Sign Variance Application,"3,400.00","July 7, 2010",NO, UO-09-P-249-552,University of Oregon,"Ford & Associates, LLC",Zebrafish Expansion Topo Survey,"6,200.00","July 8, 2010","Ford & Associates, LLC",ESB UO-09-P-301-555,University of Oregon,Cameron McCarthy Gilbert & Scheibe,Northside Parking Design and Construction SErvices,"66,250.00","July 9, 2010",NO, OSU-09-P-178-553,Oregon State University,"CSE Engineering, Inc.",ALS Concrete Pad Structural Engineering,"2,550.00","July 9, 2010",NO, UO-09-P-177-554,University of Oregon,Oslund Design Incorporated,Autzen Turf Replacement,"89,192.00","July 9, 2010",NO, PSU-09-P-65-557,Portland State University,"J.J. Henri Co., Inc.",INTERIM SUPPORT TO CONTRACTS AND COMPLIANCE,"25,000.00","July 12, 2010","J.J. Henri Co., Inc.",ESB OSU-09-P-154-556,Oregon State University,"FEI Testing & Inspection, Inc.",Sackett Hall Wall Reconstruction Special Testing,"1,224.00","July 12, 2010",NO, OSU-09-P-154-559,Oregon State University,"FEI Testing & Inspection, Inc.",EDUCATION HALL RENOVATION SPECIAL INSPECTION AND TESTING,"40,793.00","July 13, 2010",NO, OSU-09-P-168-560,Oregon State University,Balzhiser & Hubbard Engineers,"RICHARDSON HALL STEAM, CONDENSATE AND CONDENSDER PIPING REPLACEMENT","31,150.00","July 15, 2010",NO, UO-09-P-271-562,University of Oregon,"Bergeson-Boese & Associates, Inc.",CPS Substation Phase 2 Soil Testing,"6,050.00","July 16, 2010",NO, UO-09-P-148-561,University of Oregon,PBS Engineering + Environmental,Walnut Station Oversight & Soil Characterization ,"4,500.00","July 16, 2010",NO, PSU-09-P-181-563,Portland State University,Mayer/Reed,"WALK OF THE HEROINES, PHASE TWO","52,702.00","July 19, 2010",Mayer/Reed,WBE OSU-09-P-154-564,Oregon State University,"FEI Testing & Inspection, Inc.",26th & Jefferson Tunnel Lid Repair,415.00,"July 22, 2010",NO, UO-09-P-265-566,University of Oregon,"AIR, Inc. (Air Introduction & Regulation of Eugene, Inc.)",Chiles Air & Water Balancing,"12,870.00","July 26, 2010",NO, OSU-09-P-289-565,Oregon State University,Mahlum Architects,Weniger Hall Accessibility Upgrade Design,"63,940.00","July 26, 2010",NO, UO-09-P-168-568,University of Oregon,Balzhiser & Hubbard Engineers,Millrace 3 (Bldg 97) Industrial Hygiene Upgrades,"61,590.00","July 28, 2010",NO, UO-09-P-168-569,University of Oregon,Balzhiser & Hubbard Engineers,Fine Arts Studios (Bldg 125) Industrial Hygiene Upgrades,"38,995.00","July 28, 2010",NO, OSU-09-P-204-567,Oregon State University,"Carlson Testing, Inc.",Cascade Campus 1st Floor Remodel Special Testing,744.00,"July 28, 2010",NO, UO-09-P-148-570,University of Oregon,PBS Engineering + Environmental,Miscellaneous Small Campus Projects ,"50,000.00","July 29, 2010",NO, UO-09-P-265-574,University of Oregon,"AIR, Inc. (Air Introduction & Regulation of Eugene, Inc.)",Gilbert Hall Air and Water Balancing,"27,875.00","August 2, 2010",NO, UO-09-P-168-573,University of Oregon,Balzhiser & Hubbard Engineers,Beall Hall Lighing Study,"3,500.00","August 2, 2010",NO, UO-09-P-301-572,University of Oregon,Cameron McCarthy Gilbert & Scheibe,PK Park PDA Roof Structure,"34,460.00","August 2, 2010",NO, UO-09-P-123-571,University of Oregon,"Professional Service Industries, Inc. (PSI)",Gilbert/Chiles Inspection & Materials Testing,"11,056.00","August 2, 2010",NO, UO-09-P-301-576,University of Oregon,Cameron McCarthy Gilbert & Scheibe,Arena - Marquee Board Sign Variance,"5,465.00","August 3, 2010",NO, -09-P-154-575,University of Oregon,"FEI Testing & Inspection, Inc.",CPS PH2 Steam Plant Construction Testing & Inspection,"38,900.00","August 3, 2010",NO, PSU-09-P-263-581,Portland State University,ABHT Structural Engineers,MARKET CENTER BUILDING - 1ST FLOOR REMODEL,"5,550.00","August 4, 2010",ABHT Structural Engineers,"DBE, MBE" UO-09-P-301-580,University of Oregon,Cameron McCarthy Gilbert & Scheibe,West Knight Library Exterior Seating,"1,000.00","August 4, 2010",NO, OSU-09-P-4-579,Oregon State University,"Devco Engineering, Inc.",Accessibility Improvements Survey,"2,950.00","August 4, 2010",NO, OSU-09-P-154-578,Oregon State University,"FEI Testing & Inspection, Inc.",OUTDOOR RECREATION CENTER SPECIAL INSPECTION AND TESTING,"23,138.00","August 4, 2010",NO, OSU-09-P-75-577,Oregon State University,"gLAs Architects, LLC",Radiation Center Electrical Design,"16,750.00","August 4, 2010",NO, OIT-09-P-262-582,Oregon Institute of Technology,"Abeloe & Associates, Architecture, AIA",Dental Hygiene Restorative Clinic,"43,700.00","August 5, 2010",NO, OIT-09-P-262-583,Oregon Institute of Technology,"Abeloe & Associates, Architecture, AIA",Snell Hall Administrative Space Study,"9,750.00","August 5, 2010",NO, UO-09-P-249-584,University of Oregon,"Ford & Associates, LLC",UO Miscellaneous Network/Telecom Sruveys,"50,000.00","August 8, 2010","Ford & Associates, LLC",ESB PSU-09-P-204-585,Portland State University,"Carlson Testing, Inc.",URBAN CENTER - FIREWATER TANK REPLACEMENT - SPECIAL INSPECTION,"10,000.00","August 9, 2010",NO, -09-P-171-586,Portland State University,"Certified Environmental Consulting, Inc.","CRAMER HALL AND NEUBERGER HALL - RESTROOM UPGRADE, PHASE 2 - ASBESTOS AIR MONITORING","5,000.00","August 10, 2010",NO, WOU-09-P-154-587,Western Oregon University,"FEI Testing & Inspection, Inc.",West House Project Special Inspections,"2,500.00","August 10, 2010",NO, OSU-09-P-154-589,Oregon State University,"FEI Testing & Inspection, Inc.",Graf Hall Driving Simulator Special Testing,456.00,"August 10, 2010",NO, OSU-09-P-140-588,Oregon State University,Interface Engineering,Co-Op Fire Detection Design,"30,000.00","August 10, 2010",NO, UO-09-P-168-591,University of Oregon,Balzhiser & Hubbard Engineers,Arena PEPI 3 Franklin & Villard,"79,900.00","August 12, 2010",NO, OSU-09-P-148-592,Oregon State University,PBS Engineering + Environmental,196 SW 9th Street Structure Pre-Demolition Hazardous Material Survey,"3,300.00","August 12, 2010",NO, EOU-09-P-187-593,Eastern Oregon University,"Allied Works Architecture, inc.",Pierce Library Design Development-Phase I,"196,420.00","August 16, 2010",NO, UO-09-P-206-594,University of Oregon,"Geotechnical Resources, Inc. (dba GRI)",Arena - Additional Geotechnical Consultation,"4,560.00","August 19, 2010",NO, PSU-09-P-136-596,Portland State University,"InSite Group, inc.",MARKET CENTER BUILDING-MECHANICAL AND ELECTRICAL DESIGN - 1ST FLOOR REMODEL,"4,500.00","August 19, 2010",NO, OSU-09-P-128-599,Oregon State University,"Foundation Engineering, Inc.",McAlexander Fieldhouse Renovation Geotechnical Engineering,"1,500.00","August 20, 2010",NO, -09-P-139-597,Oregon Institute of Technology,Group Mackenzie,OIT Portland Campus Programming Services,"50,000.00","August 20, 2010",NO, OSU-09-P-293-598,Oregon State University,"Mcbride Architecture, P.C.",Plageman West Wing Reroof Design,"19,600.00","August 20, 2010",NO, PSU-09-P-263-601,Portland State University,ABHT Structural Engineers,PETER STOTT CENTER - ROOMS 218 & 219 REMODEL ,700.00,"August 25, 2010",ABHT Structural Engineers,"DBE, MBE" UO-09-P-11-602,University of Oregon,Synergy Engineering LLC,Standby Feeder to PLC,"11,300.00","August 25, 2010",NO, UO-09-P-11-603,University of Oregon,Synergy Engineering LLC,Susan Campbell Electrical Distribution System Analysis,"5,500.00","August 25, 2010",NO, OSU-09-P-75-604,Oregon State University,"gLAs Architects, LLC",Milam ADA Ramp Design,"18,550.00","August 26, 2010",NO, UO-09-P-122-605,University of Oregon,Yost Grube Hall Architecture,Esslinger Hall Concept Study,"47,300.00","August 26, 2010",NO, OSU-09-P-185-606,Oregon State University,"Hennebery Eddy Architects, Inc.",USGS FEASIBILITY ANALYSIS,"18,750.00","August 27, 2010",NO, UO-09-P-154-607,University of Oregon,"FEI Testing & Inspection, Inc.",Allen Hall Brick Testing & Anchor Observation,"5,790.00","August 30, 2010",NO, OSU-09-P-109-608,Oregon State University,"Clair Company, Inc.",Oxford House Fire Escape Structural Design,750.00,"September 1, 2010",NO, OSU-09-P-154-609,Oregon State University,"FEI Testing & Inspection, Inc.",Gill Coliseum Elevator Addition Special Testing,"5,584.00","September 1, 2010",NO, OUS-09-P-275-600,Chancellor's Office,"Sightlines, LLC",ROPA Annual Update & Performance Measurement,"169,800.00","September 1, 2010",NO, UO-09-P-121-610,University of Oregon,Zimmer Gunsul Frasca Architects LLP,Concept Study - Student Success Center,"74,730.00","September 1, 2010",NO, OSU-09-P-178-611,Oregon State University,"CSE Engineering, Inc.",Heat Plant South Yard Structural Engineering,"1,550.00","September 3, 2010",NO, OSU-09-P-4-613,Oregon State University,"Devco Engineering, Inc.",Student Experience Center Survey,"5,750.00","September 8, 2010",NO, OSU-09-P-128-612,Oregon State University,"Foundation Engineering, Inc.",Student Experience Center Geotechnical Engineering,"24,050.00","September 8, 2010",NO, UO-09-P-237-615,University of Oregon,"KPFF, Inc. (dba KPFF Consulting Engineers)",Casanova Extension PEPI-Storm Drainage & Wastewater,"48,500.00","September 9, 2010",NO, UO-09-P-279-616,University of Oregon,"Rowell Brokaw Architects, PC",Clark Honors College Interior Rendering,"9,500.00","September 9, 2010",NO, UO-09-P-121-614,University of Oregon,Zimmer Gunsul Frasca Architects LLP,Casanova Extension Utility Relocation Fee,"66,000.00","September 9, 2010",NO, OSU-09-P-114-617,Oregon State University,Dull Olson Weekes Architects Inc.,MILAM HALL CLASSROOM UPGRADES,"83,701.00","September 13, 2010",NO, OSU-09-P-114-618,Oregon State University,Dull Olson Weekes Architects Inc.,Withycombe Auditorium Remodel,"63,879.25","September 15, 2010",NO, UO-09-P-154-619,University of Oregon,"FEI Testing & Inspection, Inc.",Fenton Hall Testing Phase I,"15,400.00","September 17, 2010",NO, SOU-09-P-150-620,Southern Oregon University,McNamara Engineering,Various SOU Projects,"50,000.00","September 17, 2010",NO, UO-09-P-204-622,University of Oregon,"Carlson Testing, Inc.",OIMB - Charleston Marine Life Center,"7,734.20","September 20, 2010",NO, OSU-09-P-114-621,Oregon State University,Dull Olson Weekes Architects Inc.,Gilfillan Auditorium Remodel,"38,720.00","September 20, 2010",NO, OSU-09-P-148-623,Oregon State University,PBS Engineering + Environmental,EDUCATION HALL RENOVATION ASBESTOS INSPECTION,"1,790.00","September 21, 2010",NO, WOU-09-P-82-624,Western Oregon University,"Soderstrom Architects, P.C.",Maaske Hall Remodel,"14,640.00","September 21, 2010",NO, OSU-09-P-301-625,Oregon State University,Cameron McCarthy Gilbert & Scheibe,OSU Tertiary Entries,"17,500.00","September 22, 2010",NO, WOU-09-P-82-626,Western Oregon University,"Soderstrom Architects, P.C.",Werner University Center Expansion/Remodel,"86,732.00","September 22, 2010",NO, UO-09-P-148-627,University of Oregon,PBS Engineering + Environmental,Computing Center Room 180 Asbestos Abatement Design & Oversight,"9,120.00","September 23, 2010",NO, OSU-09-P-270-628,Oregon State University,Benchmark Architectural Services,Covell Hall 2nd Floor Office Remodel,"22,192.00","September 24, 2010",NO, -09-P-182-632,University of Oregon,"IDC Architects, P.C.",SCIENCE BUILDING 2-DESIGN SERVICES FOR FUTURE SPACE AND BRANDING UPGRADES TO MAIN LOBBY,"77,136.00","September 24, 2010",NO, UO-09-P-271-635,University of Oregon,"Bergeson-Boese & Associates, Inc.",Environmental Assessment North Side Parking Lot,"4,500.00","September 27, 2010",NO , UO-09-P-305-637,University of Oregon,Evergreen Engineering,UO Student Rec Fountain Infrastructure,"9,500.00","September 27, 2010",NO, UO-09-P-71-636,University of Oregon,"M. R. Richards Engineering, Inc.",Miscellaneous Small Campus Projects,"250,000.00","September 27, 2010",NO, UO-09-P-148-634,University of Oregon,PBS Engineering + Environmental,CPS PH2 EWEB Substation Trenching Oversight,"6,950.00","September 27, 2010",NO, UO-09-P-271-639,University of Oregon,"Bergeson-Boese & Associates, Inc.",CPS PH2 EWEB Substation Soil Excavation,"28,965.00","September 28, 2010",NO, OSU-09-P-4-638,Oregon State University,"Devco Engineering, Inc.",PEOPLE'S PARK CONSTRUCTION SURVEY,"1,500.00","September 28, 2010",NO, OSU-09-P-4-640,Oregon State University,"Devco Engineering, Inc.",Weniger Hall Accessibility Topographic Survey,"2,500.00","September 29, 2010",NO, OSU-09-P-154-641,Oregon State University,"FEI Testing & Inspection, Inc.",136 SW 9th Street House Demo Special Testing,769.00,"September 29, 2010",NO, -09-P-88-642,University of Oregon,"inici group, Inc. (formerly Ethos Development)",PROJECT MANAGEMENT SERVICES - OUS/OHSU COLLABORATIVE LIFESCIENCES PROJECT - INFRASTRUCUTRE COORDINAT,"32,625.00","September 29, 2010",NO, OSU-09-P-114-643,Oregon State University,Dull Olson Weekes Architects Inc.,Gill Coliseum Outer Stairwell Upgrade Design,"15,435.00","October 1, 2010",NO, OSU-09-P-154-644,Oregon State University,"FEI Testing & Inspection, Inc.",ALS Concrete Pad Special Testing,"1,599.00","October 4, 2010",NO, WOU-09-P-63-645,Western Oregon University,Geocon Northwest,Geotechnical Services Alder View II Project,"7,200.00","October 7, 2010",NO, OSU-09-P-178-646,Oregon State University,"CSE Engineering, Inc.",Milam Auditorium Structural Engineering,"4,600.00","October 8, 2010",NO, OSU-09-P-221-648,Oregon State University,PAE Consulting Engineers,Weniger Classroom Systems Upgrades,"45,000.00","October 11, 2010",NO, UO-09-P-129-647,University of Oregon,SOLARC Architecture and Engineering Inc.,Allen Hall SEED analysis,"27,466.00","October 11, 2010",NO, UO-09-P-148-649,University of Oregon,PBS Engineering + Environmental,CPS PH2 Plant Boiler #4 Asbestos Design & Oversight,"26,185.00","October 13, 2010",NO, -09-P-130-650,University of Oregon,Oh planning+design,Biomass Boiler Study,"84,500.00","October 14, 2010",oh planning,"ESB, WBE" PSU-09-P-123-652,Portland State University,"Professional Service Industries, Inc. (PSI)","CAMPUS LOOP, PHASE 2 - BP#5 GEOTHERMALWELL & HEAT PUMP-INSPECTION SERVICES","2,763.00","October 15, 2010",NO, WOU-09-P-76-653,Western Oregon University,"SERA Architects, Inc.",WOU Master Plan,"99,500.00","October 18, 2010",NO, PSU-09-P-136-655,Portland State University,"InSite Group, inc.",FOURTH AVENUE BUILDING - 87-07 ELECTRICAL INSTALLATION,720.00,"October 19, 2010",NO, PSU-09-P-136-656,Portland State University,"InSite Group, inc.",CAMPUSWIDE METERING PLAN,"65,000.00","October 19, 2010",NO, UO-09-P-149-654,University of Oregon,Simons Environmental Services,Air Quality Consulting LARPA PM2.5,"7,500.00","October 19, 2010",NO, OSU-09-P-4-659,Oregon State University,"Devco Engineering, Inc.",Heat Plant Tank Removal Survey,"3,500.00","October 20, 2010",NO, UO-09-P-206-658,University of Oregon,"Geotechnical Resources, Inc. (dba GRI)",CPS Ph1 Tunnel Geotechnical Services,"4,000.00","October 20, 2010",NO, PSU-09-P-148-657,Portland State University,PBS Engineering + Environmental,ENVIRONMENTAL CONSULTING SERVICES,"5,000.00","October 20, 2010",NO, OSU-09-P-195-660,Oregon State University,"Systems West Engineers, Inc.",Dixon DDC Pneumatic Controls Retrofit Design,"4,050.00","October 20, 2010",NO, OSU-09-P-4-661,Oregon State University,"Devco Engineering, Inc.",OSU Track & Field Complex Surveying,"4,800.00","October 25, 2010",NO, UO-09-P-154-662,University of Oregon,"FEI Testing & Inspection, Inc.",East Campus Residence Hall Testing & Inspection,"86,500.00","October 26, 2010",NO, OSU-09-P-195-664,Oregon State University,"Systems West Engineers, Inc.",LaSells Stewart Center HVAC System Evaluation,"3,250.00","October 26, 2010",NO, OSU-09-P-10-665,Oregon State University,Robertson/Sherwood/Architects pc,Plageman Hall 2nd Floor Schematic Design,"123,800.00","October 27, 2010",NO, OSU-09-P-154-667,Oregon State University,"FEI Testing & Inspection, Inc.",Plageman West Wing Reroof Special Testing,591.00,"November 1, 2010",NO, OSU-09-P-195-666,Oregon State University,"Systems West Engineers, Inc.",Radiation Center Mechanical Upgrades Design,"4,850.00","November 1, 2010",NO, UO-09-P-168-668,University of Oregon,Balzhiser & Hubbard Engineers,ROGERS HALL CHILLER REPLACEMENT,"26,460.00","November 2, 2010",NO, OSU-09-P-195-669,Oregon State University,"Systems West Engineers, Inc.",Arnold Dining Renovations Commissioning,"14,500.00","November 3, 2010",NO, -09-P-2-672,,"System Commissioning Consultants, Inc.","COMMISSIONING SERVICES FOR CAMPUS LOOP PHASE 2, BP#5","29,040.00","November 4, 2010","System Commissioning Consultants, Inc.",ESB OIT-09-P-264-670,,Adkins Consulting Engineers,Civil Engineering for Utility Corridor,"98,000.00","November 4, 2010",NO, UO-09-P-168-673,University of Oregon,Balzhiser & Hubbard Engineers,Beall Hall Lighting Systems Upgrade,"6,400.00","November 4, 2010",NO, OSU-09-P-128-674,Oregon State University,"Foundation Engineering, Inc.",Heat Plant Tank Removal Geotechnical Engineering,"13,785.00","November 5, 2010",NO, -09-P-263-676,,ABHT Structural Engineers,USB - OVERHEAD DOOR FRAMING,800.00,"November 8, 2010",ABHT Structural Engineers,"DBE, MBE" UO-09-P-305-675,University of Oregon,Evergreen Engineering,Student Rec Center Oversize Ceiling Fan Installation,"3,200.00","November 8, 2010",NO, WOU-09-P-82-677,Western Oregon University,"Soderstrom Architects, P.C.",Student Health Services Feasibility Study,"8,930.00","November 8, 2010",NO, PSU-09-P-121-678,Portland State University,Zimmer Gunsul Frasca Architects LLP,"NORTHWEST ENTER FOR ENGINEERING, SCIENCE AND TECHNOLOGY - MAIN ENTRY VESTIBULE","14,500.00","November 8, 2010",NO, OSU-09-P-4-679,Oregon State University,"Devco Engineering, Inc.",Sports Performance Facility Phase 2 Survey,"3,000.00","November 9, 2010",NO, PSU-09-P-140-680,Portland State University,Interface Engineering,PETER STOTT CENTER ENERGY UPGRADES,"80,500.00","November 9, 2010",NO, UO-09-P-26-681,University of Oregon,Paradigm Engineering,UO Primary Distribution System - Electrical System Study,"18,125.00","November 10, 2010",Paradigm Engineering,ESB PSU-09-P-65-682,Portland State University,"J.J. Henri Co., Inc.",INTERIM SUPPORT TO CONTRACTS AND COMPLIANCE,"25,000.00","November 15, 2010","J.J. Henri Co., Inc.",ESB UO-09-P-265-683,University of Oregon,"AIR, Inc. (Air Introduction & Regulation of Eugene, Inc.)",Esslinger Wing A Air Balancing of HVAC,"7,970.00","November 16, 2010",NO, OSU-09-P-190-684,Oregon State University,"Waterleaf Architecture, Interiors & Planning",Cauthorn Hall Window Replacement Design,"58,108.00","November 16, 2010",NO, OSU-09-P-190-685,Oregon State University,"Waterleaf Architecture, Interiors & Planning",Poling Hall Window Replacement Design,"67,755.00","November 16, 2010",NO, OSU-09-P-205-687,Oregon State University,"AMEC Earth & Environmental, Inc.",Cascades Campus Ground Source Heat Pump Feasibility Study,"61,200.00","November 17, 2010",NO, UO-09-P-14-686,University of Oregon,"Northwest Engineering Service, Inc.",East Campus Residence Hall Commissioning Services,"120,420","November 17, 2010",NO, -09-P-263-689,University of Oregon,ABHT Structural Engineers,MCB - 5TH FLOOR INTERIOR REMODEL,"2,500.00","November 18, 2010",ABHT Structural Engineers,"DBE, MBE" PSU-09-P-136-690,Portland State University,"InSite Group, inc.",MCB-ELECTRICAL AND MECHANICAL DESIGN FOR 5TH FLOOR NEW OFFICES,"4,500.00","November 18, 2010",NO, OSU-09-P-140-688,Oregon State University,Interface Engineering,Cauthorn & Poling Fire Alarm Separation Design,"11,100.00","November 18, 2010",NO, PSU-09-P-221-691,Portland State University,PAE Consulting Engineers,MILLAR LIBRARY BASEMENT LEAK STUDY,"3,000.00","November 22, 2010",NO, OSU-09-P-154-692,Oregon State University,"FEI Testing & Inspection, Inc.",Merryfield 109/110A Lab Renovations Special Testing,"1,076.00","November 23, 2010",NO, UO-09-P-77-693,University of Oregon,"SRG Partnership, Inc.",EMU Ground Floor Tenant Improvement,"10,000.00","November 29, 2010",NO, -09-P-144-696,Eastern Oregon University,"Professional Roof Consultants, Inc.",EOU Badgley Science Center roof and Flashing Assessment,"6,500.00","November 30, 2010",NO, PSU-09-P-129-697,Portland State University,SOLARC Architecture and Engineering Inc.,Peter Stott Center - Commissioning Services,"28,860.00","November 30, 2010",NO, PSU-09-P-204-699,Portland State University,"Carlson Testing, Inc.",MARKET CENTER - 1ST FLOOR TESTING,452.00,"December 1, 2010",NO, EOU-09-P-195-698,Eastern Oregon University,"Systems West Engineers, Inc.",Inlow Hall Renovation-Phase 2-Design Development,"12,500.00","December 1, 2010",NO, UO-09-P-148-702,University of Oregon,PBS Engineering + Environmental,Barnhart Dining Hall Asbestos Design and Oversight,"10,735.00","December 6, 2010",NO, UO-09-P-133-701,University of Oregon,S.O. Creighton Engineering Inc.,Gerlinger Annex Retrofit Fire Sprinkler System ,"7,345.00","December 6, 2010",NO, WOU-09-P-82-700,Western Oregon University,"Soderstrom Architects, P.C.",ITC Recording Studio Project,"5,400.00","December 6, 2010",NO, UO-09-P-195-703,University of Oregon,"Systems West Engineers, Inc.",Allen Hall Building Commissioning Services,"73,800.00","December 6, 2010",NO, OIT-09-P-195-704,Oregon Institute of Technology,"Systems West Engineers, Inc.",Campus Utility Metering Project,"25,450.00","December 6, 2010",NO, OSU-09-P-122-705,Oregon State University,Yost Grube Hall Architecture,Dixon Recreation Center Renovation Feasibility Study,"24,350.00","December 8, 2010",NO, UO-09-P-172-707,University of Oregon,2fORM Architecture,Baker Center Office Suite 230 Build Out,"27,500.00","December 9, 2010",2fORM Architecture,ESB PSU-09-P-163-706,Portland State University,"Deca Architecture, Inc.",MARKET CENTER BUILDING - DESIGN SERVICES FOR 8TH FLOOR PRESIDENT'S SUITE,"13,850.00","December 9, 2010","DECA Architecture, Inc.",ESB UO-09-P-10-708,University of Oregon,Robertson/Sherwood/Architects pc,MNCH Phase III Reassessment Study,"28,500.00","December 10, 2010",NO, UO-09-P-249-709,University of Oregon,"Ford & Associates, LLC",PE & Rec South Fields Improvements,"7,300.00","December 13, 2010","Ford & Associates, LLC",ESB UO-09-P-301-710,University of Oregon,Cameron McCarthy Gilbert & Scheibe,PE & Rec Synthetic Fields 3 & 4 Conversion,"62,400.00","December 13, 2010",NO, UO-09-P-204-711,University of Oregon,"Carlson Testing, Inc.",Miscellaneous Small Campus Projects,"50,000.00","December 15, 2010",NO, UO-09-P-134-712,University of Oregon,Bainbridge,LATINO STUDENT CENTER-FINISHES AND FURNISHINGS,"1,500.00","December 16, 2010",Bainbridge,WBE UO-09-P-154-713,University of Oregon,"FEI Testing & Inspection, Inc.",LISB Phase 1 Quality Control Testing & Inspection Services,"50,337.00","December 17, 2010",NO, WOU-09-P-270-716,Western Oregon University,Benchmark Architectural Services,Residential Service Center Project,"13,125.00","December 20, 2010",NO, WOU-09-P-293-717,Western Oregon University,"Mcbride Architecture, P.C.",Todd Hall Phase I Seismic Rehabilitation Project,"90,800.00","December 20, 2010",NO, UO-09-P-121-715,University of Oregon,Zimmer Gunsul Frasca Architects LLP,Residence Hall Modernization Study,"99,890.00","December 20, 2010",NO, OSU-09-P-14-718,Oregon State University,"Northwest Engineering Service, Inc.",Hallie Ford Center TAB Services,"25,900.00","December 21, 2010",NO, WOU-09-P-82-719,Western Oregon University,"Soderstrom Architects, P.C.",Arbuthnot Hall Demolition Project,33.900.00,"December 22, 2010",NO, OSU-09-P-128-720,Oregon State University,"Foundation Engineering, Inc.",Rowing Facility Improvements Geotechnical Engineering,"7,984.00","December 28, 2010",NO, OSU-09-P-30-721,Oregon State University,"Peter Meijer Architect, PC",OSU Heat Plant Pre-Design Study,"49,500.00","December 29, 2010","Peter Meijer Architect, PC",ESB -09-P-208-722,Oregon State University,GBD ARCHITECTS Incorporated,CHILD DEVELOPMENT FEASIBILITY STUDY,"91,800.00","December 29, 2010",NO, UO-09-P-282-723,University of Oregon,Pivot Architecture,Museum of Art Cafe Remodel Concept Drawings,"5,850.00","January 4, 2011",NO, UO-09-P-301-727,University of Oregon,Cameron McCarthy Gilbert & Scheibe,Knight Arena: Coordination of comprehensive monitoring plan,"8,200.00","January 5, 2011",NO, OSU-09-P-178-724,Oregon State University,"CSE Engineering, Inc.",Graf 110 Cages Structural Engineering,"2,550.00","January 5, 2011",NO, UO-09-P-305-725,University of Oregon,Evergreen Engineering,Klamath/Willamette Hall Fire Wall Phase 1,"2,600.00","January 5, 2011",NO, UO-09-P-132-726,University of Oregon,JRH Transportation Engineering,Matthew Knight Arena Traffic Monitoring,"44,900.00","January 5, 2011",NO, OSU-09-P-237-728,Oregon State University,"KPFF, Inc. (dba KPFF Consulting Engineers)",26th & Western Campus Portal,"50,950.00","January 5, 2011",NO, PSU-09-P-76-729,Portland State University,"SERA Architects, Inc.",SMITH MEMORIAL STUDENT UNION - STUDENT-FUNDED IMPROVEMEMENTS,"86,179.00","January 7, 2011",NO, OSU-09-P-128-730,Oregon State University,"Foundation Engineering, Inc.",Sports Performance Center Ph 2 Geotechnical Engineering,"2,600.00","January 13, 2011",NO, OSU-09-P-128-731,Oregon State University,"Foundation Engineering, Inc.",Black Cultural Center Geotechnical Engineering,"4,985.00","January 13, 2011",NO, OSU-09-P-128-732,Oregon State University,"Foundation Engineering, Inc.",Cesar Chavez Cultural Center Geotechnical Engineering,"1,650.00","January 13, 2011",NO, OSU-09-P-128-733,Oregon State University,"Foundation Engineering, Inc.",Asian-Pacific Cultural Center Geotechnical Engineering,"4,985.00","January 13, 2011",NO, OIT-09-P-82-734,Oregon Institute of Technology,"Soderstrom Architects, P.C.","Wilsonville Campus Programming, Design, and University's Project Manager","474,750.00","January 14, 2011",NO, OSU-09-P-4-738,Oregon State University,"Devco Engineering, Inc.",OSU Campus Property Replat,"9,000.00","January 19, 2011",NO, UO-09-P-305-737,University of Oregon,Evergreen Engineering,Kryn Stankunas Lab Remodel 233 Streisinger,"5,000.00","January 19, 2011",NO, OSU-09-P-154-736,Oregon State University,"FEI Testing & Inspection, Inc.",Rowing Facility Improvements Special Testing,"13,495.00","January 19, 2011",NO, WOU-09-P-154-739,Western Oregon University,"FEI Testing & Inspection, Inc.",Alderview Phase II Townhouses Testing,"5,763.00","January 19, 2011",NO, OSU-09-P-66-740,Oregon State University,"Elevator Consulting Services, Inc.",Finley Hall Elevator Renovation Design,"5,642.00","January 21, 2011",NO, OSU-09-P-195-741,Oregon State University,"Systems West Engineers, Inc.",Womens Building Pool Mechanical Design ,"19,680.00","January 26, 2011",NO, OSU-09-P-154-742,Oregon State University,"FEI Testing & Inspection, Inc.",Multi-Animal Teaching Facility Special Testing,"17,931.00","January 28, 2011",NO, ,,,,"5,492,583.45",,, ,,,,,,,