US 30 Culvert Rehabilitation

Design Phase

Region 1: Portland metro and Hood River County (Portland, Multnomah)


​The Oregon Department of Transportation (ODOT) is designing repair work to strengthen and lengthen the life of culverts under U.S. 30 between NW Portland to Scappoose.​


Impacts

Construction Impacts

​Most of the work is expected to occur beneath the roadway and on the shoulder of US 30. There may be limited shoulder and lane closures during construction. During these closures, people who use the shoulder for biking and walking will be provided an accessible route. More information will be available prior to the start of construction. 

Schedule

​​The project is currently in design and construction is expected in 2025. 

Details

About

This project repairs three culverts and retires one culvert under U.S. 30 between Portland and Scappose. These culverts are beyond their lifecycle and in need of repair or retirement. 

The repairs strengthen three culverts and extend their service life by cleaning the culverts and installing strengthening liners. Culvert liners will be an epoxy and fabric mix or concrete. One aging culvert will be filled and retired.

Location

U.S. 30 |

Three locations on U.S. 30 between NW Hodge Ave and NW Watson Rd, north of Portland.

Cost and Funding

​$1.6 Million in Federal and STIP funding

Benefits

​These improvements strengthen and lengthen the lifespan three culverts under U.S. 30 and prevent erosion. ​

Additional Information

Other projects in the ar​​ea:

About: We are improving the long-term safety and lifespan of the St. J​​ohns Bridge by repairing the concrete on the pier columns and arches under the bridge. 

About: We are preparing to construct stormwater treatment facilities to filter the rainwater runoff from three highways in Portland to protect fish, wildlife, water quality, and public health.

About: The Oregon Department of Transportation (ODOT) is designing repairs to strengthen and lengthen the life of culverts under U.S. 30 between NW Portland to Scappoose. ​​ ​​

Contacts & Media

Project Contact

Community Affairs Coordinator
Ellen Waters
Email
Ellen.WATERS@odot.oregon.gov
Phone
503-731-4512

Last Updated

6/17/2024 3:15 PM

Project Number

21128

Project Documents

Related documents to this project
21128 US 30 Corridor Mailer 12.2023.pdfA mailer with updates on six projects near U.S. 30 and U.S. 30 Byway.