To view full text report in PDF format, click on the highlighted Report Title. If the title is not highlighted, no electronic version is available -- you may obtain a paper copy of a report by filling in the order form or by calling 503-986-2700
|
| Date Published |
Report Title |
Abstract |
| May '08 |
Evaluation of Corrosion of Metallic Reinforcements and Connections in MSE Retaining Walls
Final Report - 872KB
|
abstract |
| April '08 |
Concrete Barrier Distress in La Grande, Oregon |
abstract |
| Mar '08 |
The Older Driver in Oregon: A Survey of Driving Behavior and Cessation
Final Report - 40.4MB
|
abstract |
| Jan '08 |
Methodologies for Estimating Advisory Curve Speeds on Oregon Highways
Final Report - 401MB
|
abstract |
| Jan '08 |
Evaluation of Solar-Powered Raised Pavement Markers
Final Report - 273MB
Turner-Fairbank Lab Test Results Attachment |
abstract |
| Jan '08 |
Mapping of Rainfall Analysis for Oregon
Final Report - 481MB
|
abstract |
| Jan '08 |
Development of Truck Axle Spectra From Oregon Weigh-in-Motion Data for Use in Pavement Design and Analysis
Final Report - 39.2MB
|
abstract |
| Aug '07 |
Final Report - 1.99MB
|
abstract |
| July '07 |
Final Report - 1.12MB
|
abstract |
| July '07 |
Geosynthetic Materials in Reflective Crack Prevention
Final Report 1.57MB
|
abstract |
| May '07 |
Adjustment of Driver Behavior to an Urban Multi-Lane Roundabout
Final Report 735KB |
abstract |
| April '07 |
Evaluation of the Oregon DMV Driver Improvement Program
Final Report 494KB
|
abstract |
| Mar '07 |
Establishing Guidelines for Incentive/Disincentive Contracting at ODOT
Final Report 1.63MB
|
abstract |
| Jan '07 |
Innovation in Environmental Streamlining and Project Delivery: The Oregon State Bridge Delivery Program
Final Report - 588KB
|
abstract |
| Jan '07 |
2004 Traveler Opinion and Perception Survey
Summary Report 360KB
|
abstract |
| Jan '07 |
Water Quality Facility Investigation
Final Report 1.26MB
|
abstract |
| Nov '06 |
Tsunami Design Criteria for Coastal Infrastructure: A Case Study for Spencer Creek Bridge, Oregon
Final Report - 3.51MB |
abstract |
| Sept '06 |
Investigation of the Bailey Method for the Design and Analysis of Dense-Gradee HMAC Using Oregon
Final Report - 780KB
|
abstract |
| Aug '06 |
Transportation and the Environment: A Research Agenda for Oregon
Final Report - 2.19MB
|
abstract |
| Aug '06 |
Animal Vehicle Crash Mitigation Using Advanced Technology Phase I: Review, Design & Implementation
Final Report - 3.19MB |
abstract |
| June '06 |
Final Report - 4.03MB
|
abstract |
| June '06 |
Electric Heating of I-84 in Ladd Canyon, Oregon
Final Report - 2.38MB |
abstract |
| June '06 |
Capabilities of Diagonally-Cracked Girders Repaired with CRFP
Final Report - 39.4MB |
abstract |
| June '06 |
Update and Enhancement of ODOT's Crash Reduction Factors
Final Report - 1.47MB
|
abstract |
| June '06 |
Comparison of Identification and Ranking Methodologies for Speed-Related Crash Locations
Final Report - 9.47MB |
abstract |
| June '06 |
Field Evaluation of the Myrtle Creek Advanced Curve Warning System
Final Report -1.69MB |
abstract |
| June '06 |
Best Practices for Traffic Impact Studies
Final Report - 5.2MB |
abstract |
| April '06 |
Evaluation of Deicer Applications on Open Graded Pavements
Final Report - 1.35KB
|
abstract |
| April '06 |
Evaluation of Inlaid Durable Pavement Markings in an Oregon Snow Zone
Final Report - 1.14MB
|
abstract |
| Nov. '05 |
Asphalt Mix Characterization Using Dynamic Modulus and APA Testing
Final Report - 1.87MB
|
abstract |
| Oct. '05 |
Transportation Planning Performance Measures
Final Report - 2.0MB
Appendices - 769KB
|
abstract |
| Oct. '05 |
Assessing the Effectiveness and Environmental Impacts of Using Natural Flocculants to Manage Turbidity
Final Report - 1.19MB |
abstract |
| Sept '05 |
Comprehensive Plan Amendment Impacts on Interchanges in Oregon
Final Report - 664KB
|
abstract |
| Aug '05 |
Dynamic Revetments for Coastal Erosion in Oregon
Final Report - 4.32MB |
abstract |
| Aug '05 |
Optimum Illumination for Nighttime Flagger Operations
Final Report - 1.09MB |
abstract |
| July '05 |
Washing Bridges to Reduce Chloride
Final Report - 340KB
|
abstract |
| July '05 |
Pedestrian Safety Impacts of Curb Extensions: A Case Study
Final Report - 395KB
|
abstract |
| July '05 |
Evaluation of Wearing Surface Materials for FRP Bridge Decks
Final Report - 214KB
|
abstract |
| June '05 |
Automated Data Collection Equipment for Monitoring Highway Condition
Final Report - 1.21MB
|
abstract |
| June '05 |
The Effect of Crack Motion During Epoxy Crack Injection and Curing
Final Report - 298KB
|
abstract |
| May '05 |
Intermittent Application of Cathodic Protection
Interim Report - 1.57MB
|
abstract |
| April '05 |
Methods for Detecting Defects in Composite Rehabilitated Concrete Structures
(CD format, available upon request)
Final Report - 9.34MB
Appendix 1 - 2.80MB
Appendix 2 - 7.45MB |
abstract |
| Mar ´05 |
Evaluation of Latex Polymers to Resist Stripping in Asphalt Pavements in Oregon
Final Report - 452KB
|
abstract |
| Dec ´04 |
Durability of Truncate Dome Warnings on Existing Curb Ramps
Final Report - 373KB |
abstract |
| Nov ´04 |
Fish Passage Through Retrofitted Culverts
Final Report - 3.77MB
|
abstract |
| Oct. ´04 |
Assessment Methodology for Diagonally Cracked Reinforced Concrete Deck Girders
Final Report - 14.08MB
|
abstract |
| Oct ´04 |
GIS Mapping of Environmental Justice Census Characteristics
Final Report - 152KB
Appendix - 1.25MB
|
abstract |
| Sept ´04 |
Evaluation of 3M Scotchlite Linear Delineation System
Final Report - 342KB
|
abstract |
| Aug ´04 |
Development and Application of a Statistical Quality Assessment Method for Dense-Graded Mixes
Final Report - 893KB
|
abstract |
| June ´04 |
Using Archived Data to Measure Operational Benefits of ITS Investments, Volume 2: Region 1 Incident Response Program
TransNow report no. TNW2004-01.2 |
abstract |
| June ´04 |
Using Archived Data to Measure Operational Benefits of ITS
Investments, Volume 1: Ramp Meters
TransNow report no. TNW2004-01.1
|
abstract |
| April ´04 |
Remaining Life of Reinforced Concrete Beams with Diagonal-Tension Cracks
Final Report - 1.92MB
Appendix A-B - 1.42MB
Appendix C-D - 524KB
|
abstract |
| Mar ´04 |
Motor Carrier Concerns About Transportation Problems In Oregon
Final Report - 223KB
|
abstract |
| Mar ´04 |
Truck Trip Data Collection Methods
Final Report - 4.02MB
|
abstract |
| Jan ´04 |
Permanent Deformation Characteristics of Oregon Mixes Using the APA
Final Report - 1.32MB
|
abstract |
| Dec ´03 |
Evaluation of Intrusion Detection Technologies for High Speed Rail Grade Crossings
Final Report - 1.51MB
|
abstract |
| Dec ´03 |
Shear Capacity Assessment of Corrosion-Damaged Reinforced Concrete Beams
Final Report - 2.45MB
Appendices - 1.83MB
|
abstract |
| Dec ´03 |
The Effect of Law Enforcement Deployment Patterns on Motorists’ Speeds
Final Report - 1.26MB
|
abstract |
| Dec ´03 |
Evaluation of Oregon Dept. of Trans. Project Delivery - Lit. Review & DOT Survey
Interim Report - 1.39MB
Appendices - 619KB
|
abstract |
| Dec ´03 |
Washing Bridges to Reduce Chloride
Final Report - 550 KB
|
abstract |
| Sept ´03 |
Concrete Patching Guide
Final Report - 276KB
Concrete Patching Material Questionnaire - 90.1KB
|
abstract |
| July ´03 |
Determining Asphalt Content for Recycled Asphalt Pavement (RAP) Materials
Final Report - 293KB
|
abstract |
| July ´03 |
Maturity Method Demonstration
Final Report - 1.68MB
|
abstract |
| May ´03 |
Development and Evaluation of Fiber Optic Sensors
Final Report - 1.99MB
|
abstract |
| May ´03 |
Selection Criteria for using Nighttime Construction and Maintenance Operations
Final Report - 1.80MB
Appendices - 2.20MB
|
abstract |
| April ´03 |
Effects of Bromacil, Diuron, Glyphosate, and Sulformeturonmethyl on Periphyton Assemblages and Rainbow Trout
Final Report - 727KB
|
abstract |
| Mar ´03 |
Field Trial of Solvent-Free Emulsion
Final Report - 565KB
Appendices - 864KB
|
abstract |
| Dec ´02 |
Effectiveness of Double Fines as a Speed Control Measure in Safety Corridors
Final Report - 500KB
|
abstract |
| Dec ´02 |
Technology Evaluation For Implementation of VMT Based Revenue Collection Systems
Final Report - 2.25MB
|
abstract |
| Dec ´02 |
Humectants to Augment Current From Metallized Zinc Cathodic Protection Systems on Concrete
Final Report - 3.42MB
|
abstract |
| Nov ´02 |
Institutional Options for VMT Data and Fee Collection Centers
Final Report - 1.20MB
|
abstract |
| Nov ´02 |
Data Transmission Options for VMT Data and Fee Collection Centers
Final Report - 935KB
|
abstract |
| Nov ´02 |
Assessment and Mitigation of Liquefaction Hazards to Bridge Approach Embankments in Oregon
Final Report (available on request)
Appendix - 395KB
|
abstract |
| Nov ´02 |
Improving the Effectiveness of Partnering
Final Report - 866KB
|
abstract |
| Sept ´02 |
Aggregate Resource Inventory and Needs Forecast Study
Final Report - 4.92MB
|
abstract |
| July ´02 |
Field Verification Process for Open-Graded HMAC Mixes
Final Report - 355KB
|
abstract |
| June ´02 |
Assessing Public Inconvenience in Highway Work Zones
Final Report - 928KB
|
abstract |
| June ´02 |
Field Evaluation of a Portable Gyratory Compactor
Final Report - 823KB
|
abstract |
| June ´02 |
Injected Polyurethane Slab Jacking
Final Report - 334KB
Follow-up Report (August 2003) - 650KB
|
abstract |
| May ´02 |
Strain Monitoring for Horsetail Falls and Sylvan Bridges
Final Report - 1.71MB
|
abstract |
| April ´02 |
A Fitness-For-Purpose Evaluation of Electro-Slag Flange Butt Welds
Final Report - 1.87MB
|
abstract |
| April ´02 |
Evaluation of Microwave Traffic Detector at Chemawa Rd/I1-5 Interchange
Final Report - 473KB
|
abstract |
| Mar ´02 |
Performance of Zinc Anodes for Cathodic Protection of Reinforced Concrete Bridges
Final Report - 2.50MB
|
abstract |
| Mar ´02 |
Development of Maintenance Practices for Oregon F-Mix
Final Report - 403KB
Appendices - 1.31MB
|
abstract |
| Mar ´02 |
Weight Enforcement and Evasion: Oregon Case Study
Final Report - 851KB
|
abstract |
| Mar ´02 |
Survey Methods for Assessing Freight Industry Opinions
Final Report - 1.23MB
|
abstract |
| Mar ´02 |
Crumb Rubber Modified Asphalt in Oregon
Final Report - 373KB
|
abstract |
| Mar ´02 |
Quality and Monitoring of Structural Rehabilitation Measures, Part 2: Review and Assessment of Non-destructive Testing (NDT) Techniques
Interim Report - 1.78MB
|
abstract |
| Jan ´02 |
Roadway Applications of Vegetation and Riprap for Streambank Protection
Final Report - 3.65MB
Appendix - 463KB
|
abstract |
| Dec ´01 |
Precast Concrete Barrier Crash Testing
Final Report - 2.81MB
|
abstract |
| Dec ´01 |
Alternatives to the Motor Fuel Tax
Final Report - 614KB
|
abstract |
| Nov ´01 |
Rockfall Catchment Area Design Guide English Version
Final Report - 4.59MB
Appendix - 3.20MB
|
abstract |
| Nov ´01 |
Rockfall Catchment Area Design Guide Metric Version
Final Report - 1.84MB
Appendix - 1.83MB
|
abstract |
| Nov ´01 |
Quality and Monitoring of Structural Rehabilitation Measures Part 1: Description of Potential Defects
Final Report - 805KB
|
abstract |
| Aug ´01 |
Evaluation of Arrow Panel Displays for Temporary Work Zones
Final Report - 575KB
|
abstract |
| Aug ´01 |
Analysis of Design Attributes and Crashes on the Oregon Highway System
Final Report - 626KB
|
abstract |
| Aug ´01 |
Desert Varnish (Permeon™ ) Evaluation
Final Report - 1.32MB
|
abstract |
| June ´01 |
Corvallis Case Study: Indirect Land Use and Growth Impacts on Highway Improvements
Final Report - 1.78MB
|
abstract |
| June ´01 |
Behavior of FRP Composite-Strengthened Beams Under Static and Cyclic Loading
Summary Report - 118KB
|
abstract |
| June ´01 |
Asphalt Concrete Patching Material Evaluation
Interim Report - 529KB
|
abstract |
| June ´01 |
LaGrande/Island City Case Study: Indirect Land Use and Growth Impacts of Highway Improvements
Final Report - 1.47MB
|
abstract |
| June ´01 |
Cementitious Materials for Thin Patches
Final Report - 244KB
|
abstract |
| May ´01 |
Finite Element Modeling of Concrete Structures Strengthened with FRP Laminates
Final Report - 2.78MB
Appendices - 390KB
|
abstract |
| May ´01 |
Micro-Deval Coarse Aggregate Test Evaluation
Final Report - 538KB
|
abstract |
| April ´01 |
A Guidebook for Evaluating the Indirect Land Use and Growth Impacts of Highway Improvements
Final Report - 252KB
Appendices A-C - 3.57MB
Appendices D-F - 361 KB
|
abstract |
| Mar ´01 |
Acceptance Procedures for Dense-Graded Mixes
Literature Review - 497KB
|
abstract |
| Mar ´01 |
Herbicide Use in the Management of Roadside Vegetation, Western Oregon, 1999-2000: Effects on the Water Quality of Nearby Streams
Final Report - 438KB
|
abstract |
| Mar ´01 |
Lane Transit District "Curb Your Car" Project
Final Report - 379KB
|
abstract |
| Mar ´01 |
Roadwaste Management: Field Trials
Final Report, Phase 2 - 978KB
|
abstract |
| Mar ´01 |
Adiem II End Terminal for Concrete Barrier
Final Report - 851KB
|
abstract |
| Jan ´01 |
Evaluation of Modified Work Zone Traffic Control Devices at Business Accesses
Final Report - 1.56MB
|
abstract |
| Jan ´01 |
Factors Affecting Sign Retroreflectivity
Final Report - 219KB
|
abstract |
| Dec ´00 |
Evaluation of Infrared Treatments for Managing Roadside Vegetation
Final Report - 1.03MB
Appendices - 3.76MB
|
abstract |
| Oct ´00 |
Roadwaste Management: A Tool for Developing District Plans
Final Report, Phase 3 - 1.65MB
|
abstract |
| Sept ´00 |
Ashland Reduced Transit Fare Demonstration Project
Final Report - 223KB
|
abstract |
| Sept ´00 |
Laboratory Comparison of Solvent-Loaded and Solvent-Free Emulsions
Interim Report - 2.40MB
|
abstract |
| Sept ´00 |
Injected Polyurethane Slab Jacking
Interim Report - 583KB
|
abstract |
| Aug ´00 |
Lighted Guidance Tube Evaluation
Final Report - 0.99MB
|
abstract |
| June ´00 |
Evaluation of Rocky Point Viaduct Concrete Beam
Final Report - 6.91MB
Appendices ABC - 586KB
Appendix D - 888KB
Appendix EF - 653KB
|
abstract |
| June ´00 |
Asphalt Cement Chip Seals in Oregon
Construction Report - 2.91MB
|
abstract |
| June ´00 |
Testing of Full-size Reinforced Concrete Beams Strengthened with FRP Composites: Experimental Results and Design Methods Verification
Final Report - 646KB
|
abstract |
| April ´00 |
Desert Varnish Evaluation Dabney State Park
Construction Report - 1.20MB
|
abstract |
| April ´00 |
Watertight Pipe Joint Survey
Final Report - 308KB
|
abstract |
| April ´00 |
Steel Slag in Hot Mix Asphalt Concrete
Final Report - 911KB
|
abstract |
| April ´00 |
Seismic Protection Devices - West Marquam Bridge Interchange
Final Report - 3.85MB
|
abstract |
| Mar ´00 |
Finite Element Modeling of Residual Stresses in Electroslag Butt Welds
Final Report - 2.78MB
|
abstract |
| Feb ´00 |
Behavior of Concrete Specimens Reinforced With Composite Materials Laboratory Study
Final Report 4.08MB
|
abstract |
| Feb ´00 |
Polypropylene Fiber-Reinforced Microsilica Concrete Bridge Deck Overlay at Link River Bridge
Final Report - 1.72MB
|
abstract |
| Jan ´00 |
Indirect Land Use and Growth Impacts of Highway Improvements
Interim Report - 158KB
|
abstract |
| Jan ´00 |
Bend Case Study: Indirect Land Use and Growth Impacts
Interim Report - 2.89MB
|
abstract |
| Dec ´99 |
Fatigue Crack Modeling in Bridge Deck Connection Details
Final Report - 831KB
|
abstract |
| Dec ´99 |
McMinnville Case Study: Indirect Land Use and Growth Impacts
Interim Report - 1.74MB
|
abstract |
| Nov ´99 |
A Comparison of Pressure Treated Wood and Cedar Signposts
Final Report - 793KB
|
abstract |
| Nov ´99 |
Monitoring of Soil Nailed Walls at the Highway 217 and Highway 26 Interchange
Final Report - 2.65MB
|
abstract |
| Oct ´99 |
Predicting Scour In Weak Rock of the Oregon Coast Range
Final Report - 1.67MB
|
abstract |
| Sept ´99 |
Millabrading Test Evaluation
Construction Report - 387KB
|
abstract |
| Sept ´99 |
The Study of Chloride Ion Migration in Reinforced Concrete Under Cathodic Protection
Final Report - 1.01MB
|
abstract |
| Sept ´99 |
Effect of Weight-Mile Tax on Road Damage in Oregon
Final Report - 1.22MB
|
abstract |
| Aug ´99 |
Grants Pass Case Study: Indirect Land Use and Growth Impacts
Interim Report - 158KB
|
abstract |
| July ´99 |
Development of Maintenance Practices for Oregon F-Mix
Interim Report - 403KB
|
abstract |
| June ´99 |
Oregon's Mobility Needs: Social Service Provider Survey
Final Report - 224KB
|
abstract |
| June ´99 |
Compaction and Measurement of Field Density for Oregon Open-Grades (F-Mix) Asphalt Pavements
Final Report - 249KB
|
abstract |
| June ´99 |
Epoxy Coated Reinforcement Study
Final Report - 507KB
|
abstract |
| June ´99 |
Guardrail Installation Noise Level Evaluation
Final Report - 268KB
|
abstract |
| Mar ´99 |
Ticket Taker Automation
Final Report - 217KB
|
abstract |
| Mar ´99 |
Geosynthetics for Reflective Crack Control - Construction Report - 108KB |
abstract |
| Feb ´99 |
Albany Case Study: Indirect Land Use and Growth Impacts
Interim Report - 544KB
|
abstract |
| Jan ´99 |
Field Application of a Thermal-Sprayed Titanium Anode for Cathodic Protection of Reinforcing Steel in Concrete
Final Report - 8.68MB
|
abstract |
| Jan ´99 |
Superpave Binder Implementation
Final Report - 223KB
|
abstract |
| Dec ´98 |
Oregon's Mobility Needs: General Population Survey and Transportation Provider Survey
Final Report - 404KB
|
abstract |
| Dec ´98 |
Evaluation of Supplemental Shields at Railroad Crossings
Final Report - 129KB
|
abstract |
| Dec ´98 |
The Oregon DOT Slow-Speed Weigh-in-Motion (SWIMM) Practices
Final Report 389KB
|
abstract |
| Dec ´98 |
Base Isolation Bearings (Dynamic Isolation Systems, Inc.)
Construction Report - 1.01MB
|
abstract |
| Dec ´98 |
Port of Entry Advanced Sorting System (PASS) Operational Test
Final Report - 228KB
|
abstract
|
| Sept ´98 |
Desert Varnish - Rocky Point Viaduct
Final Report - 5.83MB
|
abstract |
| Sept ´98 |
Ten Year Performance at Asphalt Additive Test Sections: Lava-Butte Fremont Hwy Junction
Final Report - 1.12MB
|
abstract |
| Aug ´98 |
Establishment of QC/QA Procedures for Open-Graded Mixtures
Final Report - 10.66MB
|
abstract |
| Aug ´98 |
Improving Winter Pothole Patching
Final Report - 190KB
|
abstract |
| Aug '98 |
Concrete Bridge Deck with Isotropic Reinforcing: Short Term Evaluation
Final Report - 1.86MB
|
abstract |
July ´98
|
Using LEDs in Traffic Signals
Final Report - 1.13 MB
|
abstract |
| July ´98 |
Three Cable Median Barrier
Final Report - 747KB
|
abstract |
| July ´98 |
Prioritization of Mobility Improvements Using a Multicriteria Prioritization Algorithm
Final Report - 681KB
|
abstract |
| July '98 |
Management of Stormwater Facility Maintenance Residuals
Final Report - 2.93MB
|
abstract |
| June ´98 |
Research Management Peer Exchange
Final Report - 485KB
|
abstract |
| June ´98 |
Modern Roundabouts for Oregon
Final Report - 1.86MB
|
abstract |
| June ´98 |
Roadwaste: Issues and Options
Interim Report - 8.85 MB
Appendices - 8.20MB |
abstract |
| Sept '98 |
Pavement Smoothness Indices
Final Report - 65.2KB
|
abstract |
| Mar '98 |
Strengthening Bridges Using Composite Materials
Final Report - 1.08MB
|
abstract |
| Mar ´98 |
Eliminating the Use of Ticket Takers
Final Report - 373KB
|
abstract |
| Mar ´98 |
ADIEM II End Terminal for Concrete Barrier
Construction Report - 1.22MB
|
abstract |
| Feb ´98 |
Fiber Optic Sensors for Infrastructure Applications
Final Report - 1.43MB
|
abstract |
| Jan '98 |
Prestressed Concrete Bridge Beams with Microsilica Admixture
Final Report - 0.98MB
|
abstract |
| Jan ´98 |
Evaluation of the Corridor Safety Improvement Program Phase I
Final Report - 771KB
|
abstract |
| Jan '98 |
Comparison of Skid Resistance Testing to Stopping Distance Testing
Final Report - 189KB
|
abstract |
| Dec ´97 |
Silica Fume Latex Modified Concrete Bridge Deck Overlay – Tualatin River Bridge #1417N
Final Report - 1.01MB
|
abstract |
| Dec ´97 |
Future Transportation Trends and Technology
Final Report - 511KB
|
abstract |
| Dec ´97 |
ET-2000 Extruder Guardrail End Terminal
Final Report - 585KB
|
abstract |
| Nov ´97 |
Evaluation of Revised Left Turn Signalization
Final Report - 160KB
|
abstract |
| Oct ´97 |
Evaluation of DUII Sentencing Practices in Oregon
Final Report - 743KB
|
abstract |
| Sept ´97 |
Alternative Snow and Ice Control Methods Field Evaluation
Final Report - 655KB
|
abstract |
| July ´97 |
Polymer Modified Chip Seal Test on Oregon Route #22
Final Report - 5.20MB
|
abstract |
| July ´97 |
Recycled Plastics in Highway Construction and Maintenance
Final Report - 574KB
|
abstract |
| May ´97 |
Latex and Microsilica Modified Concrete Bridge Deck Overlays in Oregon
Final Report - 618KB
|
abstract |
| May ´97 |
Repair of Studded Tire Damage Pilot Project MP 276-279 (I-5) Sec.
Construction Report - 1.07MB
|
abstract |
| April ´97 |
Low Volume Highway-Rail Grade Crossing Treatments for the Oregon High Speed Rail Corridor
Final Report 965KB
|
abstract |
| Feb ´97 |
Lock-Pin and Collar Fastening System
Final Report - 689KB
|
abstract |
| Feb ´97 |
Serb Guardrail - South Ashland Interchange, California State Line Section Pacific Highway (Interstate 5), Jackson County, Oregon
Final Report - 1.31MB
|
abstract |
| Jan ´97 |
Microsilica Modified Concrete for Bridge Deck Overlays
Final Report - 1.18MB
|
abstract |
| Aug ´96 |
Armoform Articulating Block Mat Erosion Control System
Final Report - 990KB
|
abstract |
| May ´96 |
Least Cost Transportation Planning in ODOT
Final Report, Phase 2 - 1.02MB
|
abstract |
| Dec ´95 |
Evaluation of Raised and Recessed Pavement Markers
Final Report - 988KB
|
abstract |
| Nov ´95 |
Geotextile Reinforced Bridge Approach Embankment
Final Report - 204KB
|
abstract |
| Sept '95 |
Overlay Design for Unstable Asphalt Mixes Final Report - 5.10MB |
abstract |
| Sept ´95 |
Evaluation of Rutting Potential of Oregon Surface Mixes
Final Report - 1.30MB
|
abstract |
| July '95 |
Repair of Rutting Caused by Studded Tires
Literature Review - 513KB
|
abstract |
| July '95 |
Polymer Concrete Bridge Deck Overlays
Interim Report - 5.20MB
|
abstract |
| June '95 |
Crumb Rubber Modified Asphalt Concrete in Oregon
Summary Report - 2.40MB
|
abstract |
| May ´95 |
Evaluation of PBA-6GR Binder for Open-Graded Asphalt Concrete
Construction Report - 785KB
|
abstract |
| Mar '95 |
Evaluation of Ice Alert ®
Final Report - 760KB
|
abstract |
| Dec '94 |
Evaluation of the Performance of the Reference Electrodes Embedded in Reinforced Concrete
Final Report - 1.11MB
|
abstract |
| Dec '94 |
Pavement Markings Using Waterborne Paint and Visibeads® in Region 2
Final Report - 1.07MB
|
abstract |
| Dec ´94 |
Evaluation of Porous Pavements for Road Surfaces Vol. I
Final Report - 6.19MB
Vol. II - Appendices - 6.97MB
|
abstract |
| Nov '94 |
The Nature of Rockfall as the Basis for a New Fallout Area Design Criteria for 0.25:1 Slopes
Final Report - 1.08MB
|
abstract |
| Oct '94 |
Determination of Proper Mixing and Compacting Temperatures of Laboratory Fabricated Asphalt Concrete Specimens
Final Report - 1.27MB
|
abstract |
| Jan '94 |
Field Control of Asphalt Paving Mixtures
Final Report - 631KB
|
abstract |
| Dec ´93 |
Field Test of Polymer Modified Asphalt Concrete (Murphy Rd. To Lava Butte Section)
Final Report - 4.55MB
|
abstract |
| May '92 |
Exploratory Study of Hot In-Place Recycling of Asphalt Pavements Volume I
Final Report - 9.75MB
Appendices (Volume II) - 6.86MB
|
abstract |
| Feb '92 |
Rubber Modified Asphalt Concrete (METRO RUMAC) Evaluation
Construction Report - 5.47MB
|
abstract |
| Jan '83 |
Polymer Concrete Overlay Test Program Lebanon Ditch Bridge
Final Report - 731KB
|
no abstract |