OR 99E: Kellogg Creek Project


Project Information

Project Summary: Work began November 2007 on a project to improve OR 99E (McLoughlin Boulevard) from the Kellogg Creek Bridge in Milwaukie to Roethe Road north of Gladstone.
Status and Timeline: Construction began in November 2007 and should be complete by July 31, 2008.
Latest News: Read the weekly construction news  for the latest traffic impacts on the project, updated every Friday.
 
Work began November 2007 on a two-year project to improve Highway 99E (McLoughlin Boulevard) from the Kellogg Creek Bridge in Milwaukie to Roethe Road north of Gladstone. The project will include repaving the road surface of Highway 99E, adding a new traffic signal and intersection improvements at Highway 99E and River Road, and updates to drainage systems in this section. 
 
From the River Road intersection south to Roethe, ODOT will construct new sidewalks at various locations to enhance pedestrian mobility and safety. In addition, the signals for this section will be “interconnected” to improve traffic flow along McLoughlin Boulevard, leading into the recently completed highway section in Milwaukie. 
 
Bicycle improvements include widening between River Road and Park Avenue and restriping the section of roadway to include marked bicycle lanes. That will require vehicles to park in established parking lots and off the highway shoulders. 
 
View an aerial photo simulation of the completed project
View an aerial photo simulation of the project from Kellogg Creek to Park Place
 
 

Schedule
Construction began November 2007 and should be completed by July 31, 2008. Most work will take place during off-peak hours. Notification will be provided in advance to the community for any tasks that require night work.   
 
In the first phase of construction, crews will work on completing sidewalk and curb improvements, drainage modifications and adding the new traffic signal. Intersection improvements at Highway 99E and River Road also will take place.
 
Paving work will take place during the 2008 construction season and will provide the bicycle lane improvements described above.

ODOT Contact Information
Inquiries about the project work or schedule may be directed to
 
Judy Shioshi, ODOT Community Affairs Coordinator
Phone:   503.731.8237
E-mail:  Judy.A.Shioshi@odot.state.or.us
 
Or
 
Wayne Statler, ODOT Project Manager
Phone:   503.731.3244
E-mail:  Wayne.A.Statler@odot.state.or.us  
 
The 24-hour Construction Hotline is 503-412-2330 and is available during all work hours.

 

Click here to go to the Oregon Dept. of Veterans' Affairs outreach contact form

Get Adobe Acrobat ReaderAdobe Reader is required to view PDF files. Click the "Get Adobe Reader" image to get a free download of the reader from Adobe.