Paving work will take place at night from when traffic volumes are lower on OR 224. During the paving work, pilot cars will escort drivers through the work zone. Drivers should expect 20-minute delays during the paving and striping work.
Lane closures are allowed to take place during the following hours:
Monday through Friday: 7 p.m. to 5 a.m.
Saturay and Sunday: 7 p.m. to 9 a.m.
|