| OR18/OR22 VanDuzer Corridor-Steel Br Rd |
|
 |
|
|
|
H. B. Van Duzer Forest Corridor–Steel Bridge Road Environmental Assessment and Draft Section 4(f) Evaluation (October 2002)
Revised Environmental Assessment (July 2004pdf )
Full Report: The full report is a large pdf file (17MB). We have broken it into several sections in order to make it easier for you to read and download. Please click on the following links to read or download each part of the full report
Sections of the REA
Appendices
Note: This pdf file contains linked maps and graphics. Just click the highlighted links to open the maps and graphics. Use the Back button in your Acrobat Reader toolbar to return to the main report.
Full Report: The full report is a large pdf file (24MB). We have broken it into several sections in order to make it easier for you to read and download. Please click on the following links to read or download each part of the full report.
-
Cover
-
Contents
-
Executive Summary
-
Project Identification
-
The Build Alternative
-
The No Build Alternative
-
Alternatives and Design Options Considered But Not Advanced
-
Other Types of Alternatives
-
Areas of Critical Concern and Controversial Issues
-
Probable Permit Needs and Planning Actions
-
Construction Impacts and Staging
-
Public Involvement and Agency Coordination
-
Summary of Mitigation, Impact Minimization and Conservation Measures
-
Appendix A—Right of Way Acquisition Information
-
Appendix B—Compliance of Corridor Refinement Plan with Oregon Highway Plan
-
Appendix C—Natural Resources Consultations
-
Appendix D—Cultural Resources Consultations
The Oregon Department of Transportation is committed to accessibility. Materials on this Web page that do not meet the accessibility standards defined by the World Wide Web Consortium (W3C), Web Content Accessibility Guidelines 1.0, Conformance Level "A" are available in alternate formats upon request. Please e-mail Lou Torres, or call 503/986-2880.
|
|
|
|