Grants Pass 7th Street Bridge Improvement Project
Current Information
Aerial View

Large Version
Construction Spring 2006
 
Overview - Work to be done:
  • Resurface the 7th Street Bridge deck with 22 day bridge closure, beginning April 3 through 24.
  • Overlay 6th Street from south of the 6th Street Bridge to US 199;
  • Overlay 7th Street from south of the 7th Street Bridge to the ramps at Highway 238, south of US 199;
  • Add sidewalks to 6th Street and the north side of US 199;
  • Widen the Harbeck side of the Harbeck at Union/Highway 238 Intersection, and improve the traffic signal operations at this intersection;
  • Realign Lewis Street and Park Street on the west side of 6th Street to connect to the existing Park Street on the east and install a new traffic signal.
 


- Closure and Detour Information
- Pavement Features Graphic



CONTACT INFORMATION
Bill Boyett, ODOT Public Service Representative:
774-6332 Bill.B.BOYETT@odot.state.or.us