I-84: Mosier to The Dalles

Project overview

  • Repave approximately 8 miles of Interstate 84 between Rowena (MP 76.5) to The Dalles (MP 84.3)
  • Replace the substandard concrete median barriers between MP 70.4 to MP 84.3

Vicinity Map  |  Project Information Paper

What problem will this solve?

Highway barrier.jpg
Interstate 84 is a critical part of the State’s transportation system and is a major east-west corridor for the Western United States.  Keeping the roads in good condition and providing a safe, efficient transportation system that supports economic opportunity are critical aspects of the mission for the Oregon Department of Transportation. 
 
The existing asphalt has reached its design life.  The last time this section of highway was paved was in 1994.  The 2012 pavement rating for this section was fair and the pavement wearing course is beginning to show significant raveling.  The existing concrete median barrier, which has been in place for decades, no longer meets the crash-worthiness requirements for the types and sizes of vehicles on our highways today.

Project benefits

ODOT plans to grind out the top 3” of pavement and replace it with 3” of dense, hot-mix asphalt concrete in the travel lanes.  For shoulders, 2” of pavement will be ground out and replaced with 2” of asphalt.  On and off ramps will be repaved. Replacement of existing shoulder rumble strips is included in the project. The substandard median barrier will be replaced with new barrier that meets today’s requirements for crash worthiness.

Traffic impacts

Paving of the slow lanes and outside shoulders will be performed at night while traffic is restricted to the fast lanes.  Median paving and barrier replacement as well as paving of the fast lanes may be performed during daylight hours while traffic is shifted over into the slow lanes and shoulders.  The slowing of traffic is likely because of construction but only minimal (less than 5 minute) delays are expected as a result of the slower travel speeds through the project.

Schedule

Preliminary Design ​Spring 2015
​Final Design ​Summer 2015
​Bid Opening ​Fall 2015
​Construction ​Summer 2016


Budget

Estimated cost: $10 million

Contacts

Title
Office Phone
Email
 Brad DeHart
 Project Leader
​ 541-296-2215
 Pat Cimmiyotti
 District 9 Manager
 541-296-2215
 Abbey Driscoll
 Community Liaison
 541-388-6064

Public comment opportunities

Have a comment? Contact one of the project team members above with comments or for more information.​

Keep Yourself Informed 
Sign up for email alerts or receive weekly construction updates. Click here to sign up. ​
​​