​Key Project Components

  • Realign 1st Street and Reed Road;
  • Construct a left hand turn lane from U.S. 97 to Reed Road;
  • Construct right hand turn lanes for U.S. 97 southbound traffic to 1st Street, and westbound Reed Road traffic onto northbound U.S. 97;
  • Construct sidewalks along 1st Street between U.S. 97 and Huntington Road;
  • Install crosswalks and pedestrian refuge islands at the intersection of U.S. 97 and 1st Street/Reed Road; and
  • Signalize the intersection of U.S. 97 and 1st Street/Reed Road that includes emergency vehicle preemption.

Project Vicinity Map                  Current Project Design - February 2014                       Project Information Paper

Keep Yourself Informed
Sign up for email alerts or receive weekly updates once construction begins. You will be asked to set up an account, which is free and simple. The email address you provide will only be used for this project. Simply click here to sign up.

Why This Project Is Needed

U.S. Highway 97 is a critical part of the State’s transportation system.  It is an important freight route that supplies goods and

services to central Oregon as well as Washington and California.  It is also an important highway for the residents of La Pine and surrounding area.  Keeping highways safe and traffic moving are critical parts of the mission for the Oregon Department of Transportation.
 
Problem Description
Frequent pedestrian and bicycle crossings occur at the US 97/1st Street intersection.  Yet there are no delineated pathways or crosswalks at the intersection, and field observations reveal frequent “near misses” between the pedestrians and oncoming traffic.  This situation is further compounded by high vehicular speeds from southbound traffic entering the city from the rural segment of US 97.  Also the intersection is at a skewed angle, which make pedestrian crossings and turning onto and off of the highway difficult.

La Pine is planning for significant industrial and employment growth on the east side of the city during the next twenty years.  This growth will further exacerbate the multimodal connectivity and capacity needs near the US 97/1st Street intersection, which today already meets minimum traffic volume thresholds for the installation of a traffic signal.

Although the highway width is five-lanes wide in the downtown core, the curb-side lanes were primarily used for passing or decelerating maneuvers.  In addition, the wide striped shoulder toward the north end of town served as a deceleration area. This wide cross-section made pedestrian and bicycle crossings of the highway difficult, and provided a level of discomfort for those walking or cycling alongside the highway.

What Is Being Planned 

In 2011, the U.S. 97/La Pine Corridor Plan was completed.  This was a joint effort by the City of La Pine, Deschutes County, ODOT and a consultant team.  Key findings from the Plan that directly relate to the U.S. 97/1st Street intersection include:
 
  • Frequent pedestrian and bicycle crossings occur at the U.S. 97/1st Street intersection throughout the course of the day. There are no delineated pathways or crosswalks at the intersection and field observations reveal frequent “near misses” between the pedestrians and oncoming traffic. This situation is further compounded by high vehicular speeds from southbound traffic entering the city from the rural segment of U.S. 97.
  • The intersection at U.S. 97 and 1st Street/Reed Road, intersects the highway at a skewed angle, making pedestrian crossings and turning onto and off of the highway difficult.
  • The intersection at U.S. 97 and 1st Street/Reed Road already meets minimum volume thresholds for the installation of a traffic signal.
  • La Pine is planning for significant industrial and employment growth on the east side of the city during the next twenty years. This growth will further exacerbate the multi-modal connectivity and capacity needs near the U.S. 97/1st Street-Reed Road intersection. This growth will also require multi-modal connectivity on city streets that parallel U.S. 97 to provide residents with non-highway options to access their homes and jobs.
Some of the short-term recommendations in the corridor plan were implemented in summer 2012.  They include:
North of 1st Street/Reed Road on U.S. 97
  • Lane narrowing with revised striping
  • A driver feedback speed sign for southbound traffic entering La Pine, a first in central Oregon
  • Dual intersection ahead signs with street names
  • Guide sign consolidation to the high school, post office and cemetery
South of 1st Street/Reed Road on U.S. 97
  • Intersection ahead sign with street names
  • Guide sign consolidation
1st Street and Reed Road
  • Dual stop signs with larger street names
  • Dual intersection ahead signs
Downtown corridor south of 1st Street/Reed Road
  • Restriping of U.S. 97 throughout the downtown core, reducing travel lanes to one travel lane in each direction with a center turn lane

The remainder of the key recommendations, including signalizing the intersection of U.S. 97 and 1st Street/Reed Road will be implemented with this project.

 

Key Project Milestones

Develop Roadway Design Plans​ ​2013-2014                                   ​                                         ​
Right of Way Acquisition​ ​2013-2014
Construction Contract Awarded ​Fall 2014
Construction​ ​2015
 

Project Cost Estimate

 $1.5 million
 

Project Contacts

 
Name
Title
Office Phone
Email Address
Mike Darling
Project Leader
(541) 388-6329
Gary Farnsworth
Area Manager
(541) 388-6071
Rex Holloway
Community Liaison
(541) 388-6178