Text Size:   A+ A- A   •   Text Only
ODOT Logo
2011 Stage Two Problem Statements
Stage Two
Stage Two
Listed below are the 2011 problem statements by selected by 8 expert task groups for further consideration.  All Stage 1 problem statements can be viewed at:
http://www.oregon.gov/ODOT/TD/TP_RES/2011StageOneProblemStatements.shtml 
 
Geotechnical, Hydraulics and Environmental
Matthew Mabey
 matthew.mabey@odot.state.or.us
1.  11-030-GHE  Underwater Acoustic Noise Generation and Propagation Resulting from Pile Driving for Oregon Bridge Construction 
2.  11-043-GHE  Assessment of Copper Removal from Highway Stormwater Runoff Using Fish Bone Meal: Laboratory and Field Testing 
Structures
Steve Soltesz
 steven.m.soltesz@odot.state.or.us
2.  11-023-ST  Development of Shrinkage Limits and Testing Protocols for ODOT High Performance Concrete 
 
Planning and Economic Analysis
Amanda Pietz Amanda.Pietz@odot.state.or.us
1. 11-032-PEA  Measuring the Performance of Transit Relative to Livability 
2. 11-044-PEA  Analytical Tools for Incorporation of Safety into the Long Range Transportation Planning Process in Oregon  
 
Multimodal and Sustainable Transportation
Lyn Cornell
 Linda.S.Cornell@odot.state.or.us
Pavements and Materials
Norris Shippen
 norris.shippen@odot.state.or.us
 
Roadway Design and Driver Safety
Mark Joerger
 mark.d.joerger@odot.state.or.us
2.  11-057-RDDS  Developing Safety Performance Measures for Roundabout Applications in Oregon  
Construction and Maintenance
Jon Lazarus
 Jon.M.Lazarus@odot.state.or.us
2.  11-025-CM Delivering Better Value for Money: Determining Outsourcing Feasibility and Standard Pricing Methods    
 
Traffic, Roadway Safety & ITS
June Ross
 june.h.ross@odot.state.or.us
1.  11-036-TS  Criteria for the Selection and Application of Advanced Traffic Signal Systems   

Page updated: January 09, 2012