| Dec ´99 |
Fatigue Crack Modeling in Bridge Deck Connection Details Final Report - 831.20KB
|
abstract |
| Dec ´99 |
McMinnville Case Study: Indirect Land Use and Growth Impacts Interim Report - 1.74MB
|
abstract |
| Nov '99 |
Sweet Home Business and Customer Survey Final Report - 9MB
|
abstract |
| Nov ´99 |
A Comparison of Pressure Treated Wood and Cedar Signposts Final Report - 793.94KB
|
abstract |
| Nov ´99 |
Monitoring of Soil Nailed Walls at the Highway 217 and Highway 26 Interchange Final Report - 2.65MB
|
abstract |
| Oct ´99 |
Predicting Scour In Weak Rock of the Oregon Coast Range Final Report - 1.67MB
|
abstract |
| Sep ´99 |
Millabrading Test Evaluation Construction Report - 387.34KB
|
abstract |
| Sep ´99 |
The Study of Chloride Ion Migration in Reinforced Concrete Under Cathodic Protection Final Report - 1.01MB
|
abstract |
| Sep ´99 |
Effect of Weight-Mile Tax on Road Damage in Oregon Final Report - 1.22MB
|
abstract |
| Aug ´99 |
Grants Pass Case Study: Indirect Land Use and Growth Impacts Interim Report - 6.70MB
|
abstract |
| Jul ´99 |
Development of Maintenance Practices for Oregon F-Mix Interim Report - 403.03KB
|
abstract |
| Jun ´99 |
Oregon's Mobility Needs: Social Service Provider Survey Final Report - 224.50KB
|
abstract |
| Jun ´99 |
Compaction and Measurement of Field Density for Oregon Open-Grades (F-Mix) Asphalt Pavements Final Report - 249.67KB
|
abstract |
| Jun ´99 |
Epoxy Coated Reinforcement Study Final Report - 507.11KB
|
abstract |
| Jun ´99 |
Guardrail Installation Noise Level Evaluation Final Report - 268.23KB
|
abstract |
| Jun '99 |
Asphalt-Rubber Concrete (ARC) Evaluation Interim Report - 4.31MB
|
abstract |
| Jun '99 |
Urban Freeway Reconstruction Workshop Final Report - 1.49MB
|
abstract |
| May '99 |
Geotextile Fabrics Under an Asphalt Concrete Overlay to Retard Reflective Cracking Final Report - 891.05KB
|
abstract |
| Mar ´99 |
Ticket Taker Automation Final Report - 217.22KB
|
abstract |
| Mar ´99 |
Geosynthetics for Reflective Crack Control Construction Report - 108.52KB
|
abstract |
| Feb ´99 |
Albany Case Study: Indirect Land Use and Growth Impacts Interim Report - 544.93KB
|
abstract |
| Jan ´99 |
Field Application of a Thermal-Sprayed Titanium Anode for Cathodic Protection of Reinforcing Steel in Concrete Final Report - 8.47MB
|
abstract |
| Jan ´99 |
Superpave Binder Implementation Final Report - 223.49KB
|
abstract |
| Dec ´98 |
Oregon's Mobility Needs: General Population Survey and Transportation Provider Survey Final Report - 404.99KB
|
abstract |
| Dec ´98 |
Evaluation of Supplemental Shields at Railroad Crossings Final Report - 129.47KB
|
abstract |
| Dec ´98 |
The Oregon DOT Slow-Speed Weigh-in-Motion (SWIM) Practices Final Report - 389.94KB
|
abstract |
| Dec ´98 |
Base Isolation Bearings (Dynamic Isolation Systems, Inc.) Construction Report - 1.01MB
|
abstract |
| Dec ´98 |
Port of Entry Advanced Sorting System (PASS) Operational Test Final Report - 228.08KB
|
abstract
|
| Nov ´98 |
Desert Varnish - Rocky Point Viaduct Final Report - 5.83MB
|
abstract |
| Sep ´98 |
Ten Year Performance at Asphalt Additive Test Sections: Lava-Butte Fremont Hwy Junction Final Report - 1.12MB
|
abstract |
| Sep '98 |
Concrete Bridge Decks with Isotropic Reinforcing Final Report - 2.16MB
|
abstract |
| Sep '98 |
Pavement Smoothness Indices Final Report - 65.25KB
|
abstract |
| Sep '98 |
Establishment of QC/QA Procedures for Open-Graded Mixes Final Report - 12.76MB
|
abstract |
| Aug ´98 |
Improved Winter Pothole Patching Final Report - 190.09KB
|
abstract |
| Aug '98 |
Concrete Bridge Deck with Isotropic Reinforcing: Short Term Evaluation Final Report - 1.86MB
|
abstract |
Jul ´98
|
Using LEDs in Traffic Signals Final Report - 1.13MB
|
abstract |
| Jul ´98 |
Three Cable Median Barrier Final Report - 747.26KB
|
abstract |
| Jul ´98 |
Prioritization of Mobility Improvements Using a Multicriteria Prioritization Algorithm Final Report - 681.24KB
|
abstract |
| Jul '98 |
Management of Stormwater Facility Maintenance Residuals Final Report - 2.86MB
|
abstract |
| Jun ´98 |
Research Management Peer Exchange Final Report - 485.11KB
|
abstract |
| Jun ´98 |
Modern Roundabouts for Oregon Final Report - 1.86MB
|
abstract |
| Jun ´98 |
Roadwaste: Issues and Options Interim Report - 8.63 MB
|
abstract |
| Jun '98 |
Management of Stormwater Facility Maintenance Residuals Final Report - 201.06KB
|
abstract |
| Mar '98 |
Strengthening Bridges Using Composite Materials Final Report - 1.08MB
|
abstract |
| Mar ´98 |
Eliminating the Use of Ticket Takers Final Report - 373.12KB
|
abstract |
| Mar ´98 |
ADIEM II End Terminal for Concrete Barrier Construction Report - 1.22MB
|
abstract |
| Feb ´98 |
Fiber Optic Sensors for Infrastructure Applications Final Report - 1.43MB
|
abstract |
| Jan '98 |
Prestressed Concrete Bridge Beams with Microsilica Admixture Final Report - 1MB
|
abstract |
| Jan ´98 |
Evaluation of the Corridor Safety Improvement Program Phase I Final Report - 771.87KB
|
abstract |
| Jan '98 |
Comparison of Skid Resistance Testing to Stopping Distance Testing Final Report - 189.61KB
|
abstract |
| Dec ´97 |
Silica Fume Latex Modified Concrete Bridge Deck Overlay – Tualatin River Bridge #1417N Final Report - 1.01MB
|
abstract |
| Dec ´97 |
Future Transportation Trends and Technology Final Report - 511.48KB
|
abstract |
| Dec ´97 |
ET-2000 Extruder Guardrail End Terminal Final Report - 585KB
|
abstract |
| Nov ´97 |
Evaluation of Revised Left Turn Signalization Final Report - 160.63KB
|
abstract |
| Oct ´97 |
Evaluation of DUII Sentencing Practices in Oregon Final Report - 743.25KB
|
abstract |
| Sep ´97 |
Alternative Snow and Ice Control Methods Field Evaluation Final Report - 655.15KB
|
abstract |
| Jul ´97 |
Polymer Modified Chip Seal Test on Oregon Route #22 Final Report - 5.07MB
|
abstract |
| Jul ´97 |
Recycled Plastics in Highway Construction and Maintenance Final Report - 574.73KB
|
abstract |
| Jul '97 |
High Cycle Fatigue Crack Modeling and Analysis for Deck Truss Flooring Connection Details Final Report - 2.67MB
|
abstract |
| Jun '97 |
Summary for 1996 LTPP Traffic Data Collection Final Report - 551.81KB
|
abstract |
| May '97 |
Armorform® Articulating Block Mat Erosion Control System Final Report - 9.71MB
|
abstract |
| May ´97 |
Latex and Microsilica Modified Concrete Bridge Deck Overlays in Oregon Final Report - 618.27KB
|
abstract |
| May ´97 |
Repair of Studded Tire Damage Pilot Project MP 276-279 (I-5) Sec. Construction Report - 1.07MB
|
abstract |
| Apr ´97 |
Low Volume Highway-Rail Grade Crossing Treatments for the Oregon High Speed Rail Corridor Final Report - 965.44KB
|
abstract |
| Feb ´97 |
Lock-Pin and Collar Fastening System Final Report - 689.53KB
|
abstract |
| Feb ´97 |
Serb Guardrail - South Ashland Interchange, California State Line Section Pacific Highway (Interstate 5), Jackson County, Oregon Final Report - 1.31MB
|
abstract |
| Jan ´97 |
Microsilica Modified Concrete for Bridge Deck Overlays Final Report - 1.18MB
|
abstract |
| Dec '96 |
A Study of the Wearing Caused by Studded Tires on Oregon Highways Phase II - 7.48MB
|
abstract |
| Nov '96 |
Concrete Bridge Deck with Isotropic Reinforcing Construction Report - 2.41MB
|
abstract |
| Oct '96 |
Field Application of an Arc-Sprayed Titanium Anode for Cathodic Protection of Reinforcing Steel in Concrete Interim Report - 6.08MB
|
abstract |
| Aug ´96 |
Armorform Articulating Block Mat Erosion Control System Final Report - 990.31KB
|
abstract |
| May ´96 |
Least Cost Transportation Planning in ODOT Final Report, Phase 2 - 1.02MB
|
abstract |
| Dec ´95 |
Evaluation of Raised and Recessed Pavement Markers Final Report - 988.31KB
|
abstract |
| Nov ´95 |
Geotextile Reinforced Bridge Approach Embankment Final Report - 203.25KB
|
abstract |
| Nov '95 |
Latex Modified Fiber Reinforced Concrete Bridge Deck Overlay Final Report - 354.26KB
|
abstract |
| Sep '95 |
Overlay Design for Unstable Asphalt Mixes Final Report - 4.97MB
|
abstract |
| Sep ´95 |
Evaluation of Rutting Potential of Oregon Surface Mixes Final Report - 1.30MB
|
abstract |
| Sep '95 |
Rubber Modified Asphalt Concrete (METRO RUMAC) Evaluation Construction Report - 5.03MB
|
abstract |
| Sep '95 |
Polypropylene Fiber Reinforced Concrete Detention Ponds Final Report - 846.45KB
|
abstract |
| Jul '95 |
Repair of Rutting Caused by Studded Tires Literature Review - 513.56KB
|
abstract |
| Jul '95 |
Polymer Concrete Bridge Deck Overlays Final Report - 2.15MB
|
abstract |
| Jul '95 |
Soil Nailing of a Bridge Embankment Report 2: Design and Field Performance Report Final Report - 9.50MB
|
abstract |
| Jun '95 |
Crumb Rubber Modified Asphalt Concrete in Oregon Summary Report - 2.34MB
|
abstract |
| Jun '95 |
Long Continuous Bridge Deck Evaluation John Day River Bridge Clatsop County Final Report - 1.88MB
|
abstract |
| May ´95 |
Evaluation of PBA-6GR Binder for Open-Graded Asphalt Concrete Construction Report - 785.90KB
|
abstract |
| May '95 |
Brugg Cable Mesh Rockfall Fence Final Report - 1.45MB
|
abstract |
| Apr '95 |
Evaluation of Grit-Impregnated, Epoxy Coated Prestressing Strand on South Slough (Charleston) Bridge Final Report - 816.42KB
|
abstract |
| Mar '95 |
Least-Cost Transportation Planning in ODOT Feasibility Report - 4.46MB
|
abstract |
| Mar '95 |
Evaluation of Ice Alert ® Final Report - 760.13KB
|
abstract |
| Feb '95 |
Evaluation of Adjacent AC and CRC Pavement Lanes Final Report - 1.47MB
|
abstract |
| Feb '95 |
"Fiberoptic Variable Message Signs" - Swift Interchange Final Report - 1.59MB
|
abstract |
| Feb '95 |
"Fiberoptic Variable Message Signs" - Ladd Canyon Final Report - 1.18MB
|
abstract |
| Jan '95 |
Latex and Microsilica Modified Concrete Bridge Deck Overlays in Oregon Interim Report - 3.37MB
|
abstract |
| Dec '94 |
Evaluation of the Performance of the Reference Electrodes Embedded in Reinforced Concrete Final Report - 1.11MB
|
abstract |
| Dec '94 |
Pavement Markings Using Waterborne Paint and Visibeads® in Region 2 Final Report - 1.07MB
|
abstract |
| Dec ´94 |
Evaluation of Porous Pavements for Road Surfaces Vol. I Final Report - 6.04MB
|
abstract |
| Dec '94 |
Cold Recycle Pavement Using Urea Urethane Dispersion Agent and Rubber Final Report - 750.25KB
|
abstract |
| Nov '94 |
The Nature of Rockfall as the Basis for a New Fallout Area Design Criteria for 0.25:1 Slopes Final Report - 1.08MB
|
abstract |
| Nov '94 |
Exploratory Study of Hot-In-Place Recycling of Asphalt Pavements Volume II: Appendices - 6.32MB
|
abstract |
| Oct '94 |
Determination of Proper Mixing and Compacting Temperatures of Laboratory Fabricated Asphalt Concrete Specimens Final Report - 1.27MB
|
abstract |
| Oct '94 |
Low-Cost Piezoelectric Weigh-In-Motion Systems in Oregon: 1988-1993 Final Report - 2.41MB
|
abstract |
| Oct '94 |
Microsilica Modified Concrete for Bridge Deck Overlays - Second-Year Interim Report - 970.85KB
|
abstract |
| Sep '94 |
ET-2000 Extruder Guardrail End-Terminal Construction Report - 1.36MB
|
abstract |
| Jul '94 |
Woodburn Port-of-Entry Automation Project Final Report - 3.48MB
|
abstract |
| Jun '94 |
Two-Rail Steel-Backed Timber Guardrail System Final Report - 945.60KB
|
abstract |
| Feb '94 |
Geotextile Fabrics Under an Asphalt Concrete Overlay to Retard Reflective Cracking Interim Report - 675KB
|
abstract |
| Jan '94 |
Field Control of Asphalt Paving Mixtures Final Report - 631.36KB
|
abstract |
| Jan '94 |
Evaluation of Porous Pavements for Road Surfaces Interim Report - 3.49MB
|
abstract |
| Dec '93 |
Recycled Plastics in Highway Construction and Maintenance Construction Report - 6.58MB
|
abstract |
| Dec ´93 |
Field Test of Polymer Modified Asphalt Concrete (Murphy Rd. To Lava Butte Section) Final Report - 4.44MB
|
abstract |
| Dec '93 |
ARMORFORM Articulating Block Mat Erosion Control System Interim Report - 530.15KB
|
abstract |
| Dec '93 |
Rigid Pavement Performance Data Final Report - 5.50MB
|
abstract |
| Dec '93 |
A Numerical Investigation into the Performance of the Soil Nail Wall and Pile Foundation at the Swift Delta I-5 Interchange Final Report - 7.98MB
|
abstract |
| Jul '93 |
Evaluation of Open-Graded "F" Mixtures for Water Sensitivity Final Report - 3.59MB
|
abstract |
| Jun '93 |
Latex-Modified Fiber-Reinforced Concrete Bridge Deck Overlay Construction Report - 22.46MB
|
abstract |
| May '93 |
Evaluation of Performance and Cost-Effectiveness of Thin Pavement Surface Treatments Final Report - 6MB
|
abstract |
| Mar '93 |
Geotextile Reinforced Bridge Approach Embankment Construction Report - 3.98MB
|
abstract |
| Nov '92 |
Rubber Modified Asphalt Concrete (METRO RUMAC) Evaluation: N. Marine Drive in Portland, OR; SE Stark Street in Gresham, OR Construction Report - 5.86MB
|
abstract |
| Sep '92 |
Two-Rail Steel-Backed Timber Guardrail System Construction Report - 615.38KB
|
abstract |
| Jul '92 |
Geotextile Fabrics Under an Asphalt Concrete Overlay to Retard Reflective Cracking Construction Report - 826KB
|
abstract |
| May '92 |
Exploratory Study of Hot In-Place Recycling of Asphalt Pavements Volume I Final Report - 9.51MB
|
abstract |
| May '92 |
Brugg Cable Mesh Rockfall Fence Construction Report - 2.52MB
|
abstract |
| May '92 |
Woodburn Hot In-Plant Asphalt Pavement Recycling Project Final Report - 1.12MB
|
abstract |
| May '92 |
Fiber Reinforced Concrete Detention Pond Construction Report - 581.85KB
|
abstract |
| Mar '92 |
Free Draining Base Materials Properties Final Report - 3.39MB
|
abstract |
| Feb '92 |
Asphalt-Rubber Concrete (ARC) and Rubber Modified Asphalt Concrete (Metro Rumac) Evaluation Construction Report - 2.30MB
|
abstract |
| Feb '92 |
Rubber Modified Asphalt Concrete (METRO RUMAC) Evaluation: Lakeview Junction - Matney Road Section (OR#50); Pacific Hwy - 42nd Street Section (OR#227) Construction Report - 5.33MB
|
abstract |
| Jan '92 |
Evaluation of a Keystone/Tensar Geogrid Retaining Wall System Final Report - 1.63MB
|
abstract |
| Dec '91 |
Comparison of Oregon State Highway Division Table-1 and Table-2 Asphalt Final Report - 1.23MB
|
abstract |
| Dec '91 |
Concrete Mix Design Study Final Report - 1.06MB
|
abstract |
| Dec '91 |
Evaluation of Grit-Impregnated, Epoxy Coated Prestressing Strand on South Slough (Charleston) Bridge Construction Report - 746.41KB
|
abstract |
| Dec '91 |
Evaluation of the Baladi Indirect Tensile Test Apparatus Final Report - 1.40MB
|
abstract |
| Nov '91 |
Polymer Modified Chip Seal Test: Oregon Route 22 Interim Report - 5.20MB
|
abstract |
| Nov '91 |
The Rockfall Hazard Rating System Final Report - 796.83KB
|
abstract |
| Nov '91 |
Microsilica Modified Concrete for Bridge Deck Overlays (First-Year) Interim Report - 1.21MB
|
abstract |
| Nov '91 |
Preformed, Patterned Striping Material Final Report - 784.21KB
|
abstract |
| Oct '91 |
ARMORFORM Articulating Block Mat Erosion Control System Construction Report - 537.41KB
|
no abstract |
| Oct '91 |
Asphalt Content of Hot Bituminous Mixes Using Nuclear Asphalt Content Gauges Final Report - 1.44MB
|
abstract |
| Oct '91 |
Pay Adjustment System for AC Pavements Final Report - 2.81MB
|
abstract |
| Sep '91 |
Establishing Layer Coefficients for CTB, PMBB, and RAP Final Report - 2MB
|
abstract |
| Sep '91 |
Study of Lime vs. No Lime in Cold In-Place Recycled Asphalt Concrete Pavements Final Report - 927.90KB
|
abstract |
| Aug '91 |
Soil Nailing of a Bridge Fill Embankment Construction Report - 4.88MB
|
abstract |
| Jul '91 |
Evaluation of Flyash in Lean Concrete Base and Continuously Reinforced Concrete Pavements Final Report - 773.72KB
|
abstract |
| Jul '91 |
Piezo-Electric Automatic Vehicle Classification System Final Report - 915.93KB
|
abstract |
| Jun '91 |
AC/CRC Adjacent Lane Surfacing Construction Report - 1.01MB
|
abstract |
| Jun '91 |
Oregon Asphalt-Concrete B-Mix Improvement Study Final Report - 2.09MB
|
abstract |
| Mar '91 |
Condition Monitoring of Continuously Reinforced Concrete Pavement Final Report - 1.35MB
|
abstract |
| Feb '91 |
Experimental Project Use of Shredded Tires for Lightweight Fill Construction Report - 4.26MB
|
abstract |
| Dec '90 |
Field Test of Polymer Modified Asphalt Concrete: Murphy Road to Lava Butte Section Construction Report - 10.59MB
|
abstract |
| Dec '90 |
In-Depth Study of Cold In-Place Recycled Pavement Performance Volume I Final Report - 14.55MB
|
abstract |
| Dec '90 |
In-Depth Study of Cold In-Place Recycled Pavement Performance Volume II Final Report - 2.10MB
|
abstract |
| Nov '90 |
Evaluation of Performance Based Approach for Determining Contribution of Environmental Factors to Pavement Deterioration Final Report - 2.51MB
|
abstract |
| Oct '90 |
Evaluation of Asphalt Additives: Lava Butte to Fremont Highway Junction Final Report - 3.11MB
|
abstract |
| Oct '90 |
Evaluation of Bond-Controlled, Epoxy-Coated Prestressing Strand on Hubbard Creek Bridge Final Report - 1.60MB
|
abstract |
| Oct '90 |
Microsilica Modified Concrete for Bridge Deck Overlays Construction Report - 2.38MB
|
abstract |
| Sep '90 |
Evaluation of IMS - Swedish Laser Road Tester Final Report - 1.46MB
|
abstract |
| Sep '90 |
Long Term Deck Deterioration Final Report - 436.86KB
|
abstract |
| Jun '90 |
Hot Laid, Preformed, Patterned Striping Materials Construction Report - 398.28KB
|
abstract |
| May '90 |
Evaluation of Performance and Cost-Effectiveness of Thin Pavement Surface Treatments Interim Report #2 - 5.84MB
|
abstract |
| May '90 |
Piezo-Electric Automatic Vehicle Classification System Interim Report - 656.83KB
|
abstract |
| Apr '90 |
In-Depth Study of Cold In-Place Recycled Pavement Performance Interim Report - 2.38MB
|
abstract |
| Mar '90 |
Evaluation of Asphalt Stripping Tests Final Report - 1.99MB
|
abstract |
| Mar '90 |
Serb Guardrail In-Service Evaluation Final Report - 652.45KB
|
abstract |
| Feb '90 |
Improved Materials Systems in Marine Piling After Nine Years of Exposure in Yaquina Bay - Newport, Oregon Final Report - 417.23KB
|
abstract |
| Feb '90 |
Geotextile Strips as a Reflective Crack Treatment for AC over AC Final Report - 547.33KB
|
abstract |
| Jan '90 |
Swalley Canal Ice Detection System Final Report - 412.25KB
|
abstract |
| Jan '90 |
Procedures Manual for the Determination of International Roughness Index on HPMS Sites in Oregon - Operations and Calibration Final Report - 734KB
|
abstract |