U.S. 97 / Murphy Road: Brookswood - Parrell (Bend)

 
 
 
 
 
 
 
 
 
 
 
 

Current News

New Project Website Name
In an effort to make it easier for everyone to remember the project website, we've created a new domain name.  The new name is www.us97andmurphyroad.com.  The link will also work with an extension of .org and .net.  Those links will do is direct people to this website.  If you already have this page bookmarked, don't worry, your bookmark will still work.

With construction slated to begin this summer, we want to make it easy for people to find current information.  Our goal is to have the most up-to-date construction information available on this website.  Another tool we will use to update everyone is email blasts.  See the next section about how to sign up for this service.

Keep Yourself Informed
Sign up for email alerts or receive weekly updates once construction begins in 2013.  You will be asked to set up an account, which is free and simple.  The email address you provide will only be used for this project.  Simply click on the envelop and sign up. 

Purpose of the Project and Project Components

Purpose of Project
The purpose of the project is to improve safety and connectivity by constructing an east – west arterial in the south end of Bend and eliminating the traffic signals at the intersections of U.S. Highway 97 at Pinebrook Boulevard and U.S. 97 at 3rd Street.
 
The overall cost estimate of transportation improvements needed in the U.S. 97/Murphy Road area is $45 million. The first functional project, described below, is estimated to cost $25.1 million and is mostly funded by the Jobs and Transportation Act.  Future projects in the area will be built using a variety of federal, state, local and private funding. 

Components
The project consists of an extension and realignment of Murphy Road from Parrell Road across U.S. 97 to Brookswood Blvd.  The road and bridge improvements include:  

  • A realignment of Murphy Road from 3rd Street (business U.S. 97) east to Parrell Road.
  • An extension of Murphy Road from 3rd Street (business U.S. 97) west to Brookswood Blvd.
  • A new bridge on Murphy Road that crosses over U.S. 97 (Bend Parkway).
  • A new southbound flyover bridge from 3rd Street to U.S. 97.  The new structure enables the traffic signal at the intersection of U.S. 97 and 3rd Street to be removed which will resolve the existing safety issues at the intersection.
  • Modification of accesses at 3rd Street/Murphy Road and U.S. 97 and Pinebrook Blvd.
  • A realignment of the existing northbound exit from U.S. 97 to 3rd Street.
  • Construction of a roundabout at the intersection of the new Murphy Road and 3rd Street.
  • Construction of a roundabout at the intersection of Murphy Road and Brookswood Boulevard.
  • Construction of a roundabout at the intersection of Murphy Road and Parrell Road.
  Project Information Paper - December 2011          Current Project Design Map - August 2011

Project Background and Benefits
This project is a strategic improvement to U.S. 97 freight mobility, and greatly enhances safety and mobility for the overall transportation system for Bend.   U.S. 97 is a statewide priority expressway and designated as a primary freight and travel route throughout Central Oregon.  Murphy Road is an arterial road and a strategic corridor for the City of Bend’s overall transportation system. 
 
The elimination of the signalized intersections at Third Street and Pinebrook Boulevard on U.S. 97 will alleviate congestion and increase mobility in the corridor and greatly reduce the crashes at these locations, which are some of the highest in central Oregon. 
 
The U.S. 97/Murphy Road project is a high priority for the City of Bend, Bend Metropolitan Planning Organization, ODOT Region 4, and the Central Oregon Area Commission on Transportation.  This project has been identified in the South Parkway Refinement Plan, Murphy Crossing Refinement Plan, and the U.S. 97: South Parkway /Murphy Interchange Area Management Plan. 

Funding
The preliminary cost estimate for these road and bridge improvements is approximately $25.1 million and is being mostly funded through the Jobs for Transportation Act (HB 2001).

Key Project Milestones

 Public outreach and concept design   2010 / 2011
 Begin final design  Summer 2011
 Begin right-of-way purchases  Fall 2011
 Bid let​ ​ May 2013
 Construction​ ​ 2013-15
  
                                         
Related Links and Project Materials
Related Links
 
City of Bend
Murphy Crossing Refinement Plan
SE Interceptor Project 
 
Joint City of Bend and ODOT
U.S. 97: S. Parkway/Murphy Interchange Area Management Plan
Murphy Road Corridor Project
 
Other
Bend Metropolitan Planning Organization

Project Materials
Current Project Design Map - August 2011
Project Information Sheet - December 2011
Stakeholder Involvement Summary - May 2011 
 
Design Acceptance Package - May 2011
 
Original Design Concept 

Project Contacts
 
 Name
 Affiliation
 Telephone
 Number
 Email Address
 Amy Pfeiffer
 Project Leader, ODOT
 (541) 388-6052
 amy.l.pfeiffer@odot.state.or.us
 Nick Arnis
 Transportation Manager,
 City of Bend
 (541) 388-5542
 narnis@ci.bend.or.us
 Terry Pistole
 Senior Right of Way Agent,
 ODOT
 (541) 388-6431
 terry.d.pistole@odot.state.or.us
 
 Rex Holloway
 Community Liaison, ODOT
 (541) 388-6178
 rex.a.holloway@odot.state.or.us