U.S. 101: 39th Street to Holmes Road Improvements

Construction Phase

Region 2: Willamette Valley and Northwest Oregon (Lincoln City, Lincoln)


​​​​​​​​​​​​We're improving safety and accessibility by installing new sidewalks and curb ramps on the east side of U.S. 101. ​


Banner: Slow down, in the work zone it could save lives. Building a modern transportation system to help Oregon’s communities and economy thrive. During construction, Give yourself more time, try a new way or mode to get there or take a different route.

Impacts

Traffic Impact

Shoulder and lane closures as needed.

Construction Impacts

You can expect:

  • Shoulder and lane closures with flaggers directing traffic as needed.
  • Construction noise and delays.
  • Sidewalk and curb ramp closures – follow the posted pedestrian detour routes.
  • Businesses to remain open and access to be maintained during construction.

Construction Activities

We're adding sidewalks, ADA curb ramps and new drains.

Visit TripCheck for the most current traffic information.​


​Pedestrians, including those with disabilities, will have access through or around work zones. ​


work zone construction iconPay attention in the work zone, slow down and move over – imagine this is where you work! 

Always drive safely, watch for construction signs and workers. 

Remember: fines double in all Oregon work zones, whether workers and signs are present or not.

Details

About

​Lincoln City is a mix of businesses and residences. Tourists, cyclists, pedestrians and locals travel on U.S. 101 between 39th Street to Holmes Road. 

To make it safer and more accessible for all users, we're:

  • Constructing new sidewalks on the east side of U.S. 101 between NW 34th Street to NE Holmes Road.
  • Building ADA curb ramps.
  • Installing new drains to help improve water drainage in the area.
  • Looking into adding bike lanes. ​

By improving and building new sidewalks, we're making safer connections whether you drive, ride, walk or roll.

Schedule

Design: 2023-2026

Construction: 2026-2027

Location

U.S. 101 |

​Milepost 112.9 to 113.4

Cost and Funding

​Design and construction: $3,130,973

Contacts & Media

project area map highlighting U.S. 101 from 39th Street to Holmes Road

Project Contacts

Resident Engineer
Steve Schultz
Email
steven.schultz@odot.oregon.gov
Phone
541-757-4211

Public Information Officer
Mindy McCartt
Email
mindy.m.mccartt@odot.oregon.gov
Phone
503-507-6045

Get Project Alerts

Sign up for the newsletter!

Last Updated

11/20/2026 12:02 PM

Project Number

23431