OR 214: Johna Lane - Fenne Lane Sidewalks

Construction Phase

Region 2: Willamette Valley and Northwest Oregon (Silverton, Marion)


​​​​​​​This project builds new sidewalks on the northside of OR 214 (South Water Street) in Silverton between Johna Lane and Fenne Lane.   ​​​​

Construction Banner

Impacts

Traffic Impact

Expect construction noise, delays and occasional lane closures with flaggers helping direct traffic.​

Construction Impacts

We are working Monday through Friday 9:00 a.m. to 2:00 p.m.

For the most up to date information visit TripCheck.com​.

Construction Activities

Interactive Construction MapThe crew is installing erosion control measures and saw cutting the pavement in preparation for installation of new storm sewer features.



Access for pedestrians, including those with disabilities, will be available and identified through or around work zones.

Details

About

Currently, the stretch of South Water Street between Johna and Fenne Lane lacks sidewalks and does not meet American for Disabilities Act (ADA) requirements. The project will constuct sidewalks on the northeast side of the road and they will be built to ADA standards.

​This segment of OR 214 is the only available route for vehicles and pedestrians to get from downtown Silverton to the southern neighborhoods.

Schedule

​Design 2019-2021
Construction to begin in early 2022

Location

OR 214 | City of Silverton on South Water Street

Cost and Funding

The cost estimate for this project is $2.2 million.

Contacts & Media

Project Map

Project Contacts

Resident Engineer
Vidal Francis
Email
vidal.t.francis@odot.oregon.gov
Phone
503-986-2698

Assistant Resident Engineer
Astrid Potter
Email
astrid.j.potter@odot.oregon.gov
Phone
503-986-2683

Get Project Alerts

Sign up for the newsletter!

Last Updated

5/18/2022 6:58 PM

Project Number

18745