I-5: Interstate Sign Replacement Project

Construction Phase

Region 1: Portland metro and Hood River County (Portland, Multnomah)


The Oregon Department of Transportation is working on a sign project to ins​tall, replace, repair and upgrade existing interstate signs and sign structures in 2018 to meet current federal standards. 

Impacts

Traffic Impact

This is an interactive map showing the project area on I-5 and the weekly traffic impacts due to construction.
Click on the interactive map above to see the sign work locations and weekly traffic impacts on I-5.

Please also visit the Weekly Construction Update Page or visit https://TripCheck.com​ for all the latest traffic impacts in the Portland/Metro region.​

Construction Impacts

Night Work
Nighttime and some daytime construction activities will occur at each site location. Construction will begin on I-5 first, and then on I-84. As the project progresses, work will take place on both highways at the same time.​​

Nighttime construction noise will occur intermittently at specific site locations on I-5 and I-84 and those working or living in the area may hear the noise. 

Noise will come from heavy equipment, construction trucks, beeping when construction vehicles are in reverse (a requirement by the Occupational Safety and Health Administration), and equipment such as concrete saws, drills and haul trucks. Work is expected to be completed at most sites within two and six nights. However, other sites will take longer to complete.

Nighttime lane restrictions on I-5 will occur weekdays from 8 p.m. to 5:30 a.m. and weekends from 8 p.m. to 9 a.m. Nighttime lane restrictions on I-84 will occur weekdays from 10 p.m. to 5 a.m. and weekends from 11 p.m. to 8 a.m.​

Working at night is necessary to keep daytime traffic flowing on these heavily traveled freeway. 

For noise-related questions or concerns during construction, call the 24-hour noise hotline at (503) 412-2361.

Schedule

​Construction: Currently underway through Fall 2018
 
*Schedule is subject to change based on weather and site conditions. ​

Details

About

The Oregon Department of Transportation is working on Interstate 5 and Interstate 84​ in 2018 to ins​tall, replace, repair and upgrade existing interstate signs and sign structures to meet current federal standards. 
 
The project area along I-5 will occur south of the Iowa Street viaduct and north of the OR Highway 217 interchange. The project area along I-84 will occur between the NE 102nd Ave. overcrossing and slightly east of the NE 148th Ave. overcrossing. 

Project information for the I-84 Sign Replacement Project is available at

In 2015, ODOT replaced several green highway signs along Interstate 5 in Portland. ​
  ​​​​​​​​​​​​​​​​​​

Location

I-5 | south of the Iowa Street viaduct and north of the OR 217 interchange

Cost and Funding

​$4,049,479.00

Contractor

​Coral Construction

Benefits

The new signs will feature more reflective materials and a less cluttered design, making them easier to read. 

What Problem Will This Improve?

Several existing interstate signs and sign structures on I-5 and I-84 are in poor condition and need to be replaced, repaired or upgraded to meet current federal highway standards. 

Additional Information

For ADA (Americans with Disabilities Act) or Civil Rights Title VI accommodations, translation/interpretation services, or more information call 503-731-4128, TTY 800-735-2900 or Oregon Relay Service 7-1-1.​​​
  
Si desea obtener información sobre este proyecto traducida al español, sírvase llamar al 503-731-4128.
 
Если вы хотите, чтобы информация об этом проекте была переведена на русский язык, пожалуйста, звоните по телефону 503-731-4128.
 
如果您想瞭解這個項目翻譯成 繁體中文 的相關資訊,請致電(503)731-4128. 如果您想了解这个项目翻译成 简体中文 的相关信息,请致电503-731-4128​.
 
이 프로젝트에 관한 한국어로 된 자료 신청방법 전화: 503-731-4128​.
 
Nếu quý vị muốn thông tin về dự án này được dịch sang tiếng Việt, xin gọi 503-731-4128.​

Maps & Media

This is a map showing the project area and site locations where work will occur at different sites along I-5.

Videos


Video Link

Project Contact

Community Affairs Coordinator
Dee Hidalgo
Email
Dee.Hidalgo@odot.state.or.us
Phone
503-731-8237

Last Updated

6/12/2018 11:11 AM

Project Number

19201-A

Project Documents

Related documents to this project
I-5-Sign Replacement-Map-19201-A.pdfThis is a map showing the project area and sign locations on I-5.