Project Details

I-5: Marquam Bridge Electrical and Lighting Replacement Project

Design Phase

Region 1: Portland metro and Hood River County (Portland, Multnomah)


​This project will replace the existing electrical and lighting systems for both the upper and lower decks of the Marquam Bridge. The bridge deck lighting fixtures, and navigation channel and pier lighting will be updated to modern LED technology. These upgrades will increase reliability, improve water navigation and freeway user safety, and reduce maintenance and operating costs.

Impacts

Traffic Impact

​Typical traffic impacts include limited duration temporary lane closures. Most of the work will take place at night to reduce congestion. More information will be available prior to construction.

All existing navigation channel, pier and freeway lighting systems will remain operational during the project to the extent possible.

Schedule

​Construction is expected to start in summer 2019. Construction will not take place on major holidays or during large public events in the area. More information will be available prior to construction.

Details

About





This project will improve visibility and safety for both freeway and marine users on or near the Marquam Bridge. The project will replace the existing electrical conduit and wiring for the upper and lower deck electrical and illumination systems, convert fixtures to LED lighting, convert navigation channel and pier lights to LED lighting, and install new service cabinets.


These upgrades will increase reliability, improve water navigation and freeway user safety, and reduce maintenance and operating costs. 


All existing navigation, pier, channel marker and freeway lighting systems will be operational during the replacement project to the extent possible.

Location

I-5 | ​This project takes place along the Marquam Bridge, extending from the I-5 northbound ramp beginning near Tilikum Crossing, the I-405 southbound to I-5 northbound ramp beginning from Naito Parkway to Pier Number 5 located on the east bank of the Willamette River.

Cost and Funding

​$2,512,869

Benefits

​This project will increase safety for motorists and maritime users along and adjacent to the Marquam Bridge and its inbound and outbound ramps. The lighting and electrical system updates will also reduce maintenance and operating costs.

What Problem Will This Improve?

  • Improved lighting and safety for motorists and maritime users along and adjacent to the Marquam Bridge and its inbound and outbound ramps.
  • ​Reduced maintenance and operating costs.

Additional Information

For Americans with Disabilities Act (ADA) or Civil Rights Title VI accommodations, translation/interpretation services, or more information call 503-731-4128, TTY 800-735-2900 or Oregon Relay Service 7-1-1. 
 
Si desea obtener información sobre este proyecto traducida al español, sírvase llamar al 503-731-4128.
 
Если вы хотите, чтобы информация об этом проекте была переведена на русский язык, пожалуйста, звоните по телефону 503-731-4128.
 
如果您想瞭解這個項目翻譯成 繁體中文 的相關資訊,請致電(503731-4128. 如果您想了解这个项目翻译成 简体中文 的相关信息,请致电503-731-4128​.
 
프로젝트에 관한 한국어로 자료 신청방법 전화: 503-731-4128​.
 
Nếu quý vị muốn thông tin về dự án này được dịch sang tiếng Việt, xin gọi 503-731-4128

Contacts & Media

Project Contact

Community Affairs Coordinator
Ellen Sweeney
Email
Ellen.SWEENEY@odot.state.or.us
Phone
503-731-8230

Last Updated

4/17/2019 11:21 AM

Project Number

19652

Your browser is out-of-date! It has known security flaws and may not display all features of this and other websites. Learn how

×