About
Due to the poor condition of the bridge surfaces, this project replaced the bridges on Interstate 84 over Graham Road in Troutdale.
We constructed a third lane on Graham Road under the bridges and the height of the bridges was raised to better accommodate truck traffic. We built a sidewalk and bike path on the east side of Graham Road for pedestrians and cyclists.
Before and after: Graham Road, looking north. The original image shows bridge damage from tall vehicles, two narrow travel lanes, and no sidewalk. The completed image shows the new third travel lane, bike lane, and sidewalk.
Before and after: I-84 westbound bridge surface. The bridges were replaced due to age and deteriorating roadway surfaces.
Project Location
(Click to download map.)
Location
I-84
|
I-84 Graham Road/257th Interchange in Troutdale
Cost and Funding
Project cost: $18,778,314
What Problem Will This Improve?
- The I-84 bridges over Graham Road were aging and due to be replaced. In particular, the westbound bridge surface showed severe deterioration in recent years.
- The vertical clearance under the bridges was only 13.5', which is too short to safely accommodate the passage of large trucks and oversized vehicles.
- Where Graham Road passed under I-84, there were narrow shoulders and no designated pedestrian sidewalks.
- The two lanes on Graham Road under the bridges were not wide enough to accommodate the increase in northbound traffic, generated by new industrial development north of I-84.
Additional Information
Si desea obtener información sobre este proyecto traducida al español, sírvase llamar al 503-731-4128.
Если вы хотите, чтобы информация об этом проекте была переведена на русский язык, пожалуйста, звоните по телефону 503-731-4128.
Nếu quý vị muốn thông tin về dự án này được dịch sang tiếng Việt, xin gọi 503-731-4128.
이 프로젝트에 관한 한국어로 된 자료 신청방법 전화: 503-731-4128.
如果您想瞭解這個項目翻譯成繁體中文的相關資訊,請致電 503-731-4128.
如果您想了解这个项目翻译成简体中文的相关信息,请致电 503-731-4128.