US97: Nels Anderson - Romaine Village Way

Construction Phase

Region 4: Central Oregon (Bend, Deschutes)


​​​​​​​​​​​​The Oregon Department of Transportation is working on a project that will repair pavement deterioration and make safety improvments to pedestrian crossings and ADA ramps along U.S. 97 between Nels Anderson Place and Romaine Village Way. 


Impacts

Construction Impacts


Construction activities for this project are scheduled to begin on March 8 with night time single lane closures on Bend Parkway transitioning into full one-direction closure of the Parkway with signed detours starting March 14. Construction activity is scheduled to continue through May 15.

Signed detours will redirect traffic to the business route on 3rd Street, which doubles as the U.S. 97 business route.

The $7.5 million repaving project was awarded to Knife River and will include two inches of new pavement the length of the project corridor to address deterioration and rutting. Additional improvements will include 64 new ADA curb ramps, push-button controllers and other upgrades at pedestrian signal crossings.

Closures will take place nightly from 8 p.m. to 6 a.m. Sunday night to Friday morning.

DETOUR ROUTES

 

Closures will be signed and organized in stages, with southbound closures taking place in Stage 1 as follows:

 

Southbound Closure #1​ – U.S. 97 southbound will be closed from Exit 135A to Reed Market Exit 139. All southbound traffic will be diverted onto U.S. 97 Business Route (3rd St.) and will be detoured south to Reed Market where travelers will be able to regain access to U.S. 97 by way of the U.S. 97 southbound on-ramp at Reed Market.​

Southbound Closure 1Southbound Closure #2​ – U.S. 97 southbound will be closed from Exit 139 (Reed Market Road) to Exit 141 (Murphy Road). All southbound traffic will be diverted onto U.S. 97 Business Route (3rd. St.) and will be detoured south to Murphy Road where travelers will be able to regain access to U.S.97 by way of the U.S.97 southbound on-ramp at Murphy Road.




Northbound closures will take place in Stage 2, as follows:

Northbound Closure #1 – U.S.97 northbound will be closed from Exit 141 (Murphy Road.) to Exit 139 (Reed Market Road.). All northbound traffic will be diverted onto U.S. 97 Business Route (3rd.St.) and will be detoured north to Reed Market Road where travelers will be able to regain access to U.S. 97 by way of U.S. 97 northbound on-ramp at Reed Market Road.

Northbound Closure #2​ – U.S.97 northbound will be closed from Exit 139 (Reed Market Road.) to Exit 135B (Empire Ave.). All northbound traffic will be diverted onto U.S. 97 Business Route (3rd. St.) and will be detoured north to Empire Ave. where travelers will be able to regain access to U.S. 97 by way of U.S. 97 northbound on-ramp at Empire Ave.

CONSTRUCTION SCHEDULE UPDATE - 05/03/21

On Monday Night May 3 -- The contractor will be performing Stage 1 Phase 1 SB Closure: US97
Southbound will be closed From Exit 135A to Reed Market Exit 139. All SB traffic will be diverted onto US97 Business route (3rd St.) and will be detoured south to Reed Market where travelers will be able to regain access to US97 by waynof the US97 SB on-ramp at Reed Market.

On Tuesday Night, May 4 -- The contractor will be performing Stage 1 Phase 2 SB Closure: US97 Southbound will be closed from Exit 139 (Reed Market Rd) to Exit 141 (Murphy Rd). All SB traffic will be diverted onto US97 Business route (3rd. St.) and will be detoured south to Murphy Rd where travelers will be able to regain access to US97 by way of the US97 SB on-ramp at Murphy Rd.

On Wednesday Night, May 5 – The contractor will be performing Stage 2 Phase 2 NB Closure: US97 Northbound will be closed from Exit 139 (Reed Market Rd.) to Exit 135B (Empire Ave.). All NB Traffic will be diverted onto US97 Business route (3rd. St.) and will be detoured north to Empire Ave. where travelers will be able to regain access to US97 by way of US97 NB on-ramp at Empire Ave.
On Thursday Night, May 6 -- The contractor will be performing Stage 1 Phase 1 SB Closure:
US97 Southbound will be closed From Exit 135A to Reed Market Exit 139. All SB traffic will be diverted onto US97 Business route (3rd St.) and will be detoured south to Reed Market where travelers will be able to regain access to US97 by way of the US97 SB on-ramp at Reed Market.


 

ALL CLOSURES AND WORK WILL OCCUR BETWEEN 8 p.m. – 6 a.m.​





Schedule

Bid awarded to Knife River in December 2020
Construction - March 8-May 15, 2021

Details

About

For this project, ODOT will complete a 2-inch grind and inlay along the length of corridor to address pavement deterioration and stud rutting, replace signs that have reached their life expectancy, upgrade ADA ramps, and upgrade pedestrian push buttons. 

These changes are needed to repair pavement deterioration, make pedestrian access along this route safer, and improve safety and ease of acccess for people with disabilities. This project will make U.S. 97 safer for all travelers and extend the life of the highway which is an important route for interstate traffic as well as local and business traffic. 

Location

U.S. 97

Cost and Funding

$7.5 million

Contractor

Knife River

What Problem Will This Improve?

​The​ current condition of this segment of U.S. 97 is deteriorating and making pavement conditions unsafe for travelers. Additionally, the project corridor must have improvements made to ADA ramps and pedestrian crossings in order to stay current with safety requirements. 

Contacts & Media

https://www-auth.oregon.gov/odot/Projects/Project%20Images/Nels%20Anderson%20Vicinity%20Map.jpg

Project Contact

Project Manager
Aron Sturko
Email
aron.sturko@odot.state.or.us
Phone
541-388-6166

Last Updated

5/3/2021 5:10 PM

Project Number

20013

Project Documents

Related documents to this project
20013_PIP_updated.jpgProject information paper updated 12/11/20
Bend Parkway Detour Maps.pdfProject Construction Detour Maps



Your browser is out-of-date! It has known security flaws and may not display all features of this and other websites. Learn how

×