OR 58 Culvert Repair and Replacement Project

Construction Phase

Region 2: Willamette Valley and Northwest Oregon (Klamath, Lane)


​​​​​​​​​​​​Repair or replace culverts along the highway that are in poor condition.


Banner: Slow down, in the work zone it could save lives. Building a modern transportation system to help Oregon’s communities and economy thrive. During construction, Give yourself more time, try a new way or mode to get there or take a different route.

Impacts

Traffic Impact

Expect delays of up to 20 minutes between milepost 13 and milepost 64.

Construction Impacts

We are working Monday through Friday, from 6 a.m. to 7 p.m. 

You can expect:

  • Shoulder closures.

  • Single lane closures weekdays between 6 a.m. to  7 p.m. with flagging.

  • Up to three work zones.

  • Potential delays up to 20 minutes.

  • Construction noise.​

Construction Activities

We are placing a liner inside 20 culverts, installing rocks and replacing vegetation at the culvert openings. We are repaving the road at the culverts. ​

Some of this work is weather dependent. We expect to complete construction by Fall of 2023.

Visit TripCheck​ for the most current traffic information.​


​Pedestrians, including those with disabilities, will have access through or around work zones. ​


work zone construction iconPay attention in the work zone, slow down and move over – imagine this is where you work! 

Always drive safely, watch for construction signs and workers. 

Remember: fines double in all Oregon work zones, whether workers and signs are present or not. ​​​

Details

About

​The OR 58 corridor is a lifeline route between the southern Willamette Valley (I-5) and Central Oregon (U.S. 97). There are several projects underway to explore how to help keep critical services accessible. This project identified 54 culverts needing repair or replacement because they are in poor or critical condition. The culverts are being reviewed to see if sizes need to be increased to address water flow or fish passage.

The shallow culverts will require digging trenches through the road and the deeper culverts will be replaced by drilling under the road.

This project is being developed by Western Federal Lands a division of the Federal Highway Administration.

​Schedule

Design: 2019-2022

Construction: 2023​​

Location

OR 58 |

​From I-5 to U.S. 9​7, milepost 2.73 to 64

Cost and Funding

​$12.6 million

Contacts & Media

Project Area Map

Project Contacts

Resident Engineer – Consultant Projects
Julie GaNung
Email
julie.e.ganung@odot.oregon.gov
Phone
541-726-2578

Public Information Officer
Mindy McCartt
Email
mindy.m.mccartt@odot.oregon.gov
Phone
503-507-6045
Public Comment Form
Submit a commentfor project

Last Updated

9/21/2023 11:12 AM

Project Number

20102