About
This project resurfaces and restores U.S. 101 from New Youngs Bay Bridge at milepost 5.3 to Neptune Drive (Warrenton) at milepost 6.8.
We will also:
Work will require brief lane closures with flagging for duration.
Schedule
Design: 2018 - 2021
Construction: 2022
Location
U.S. 101
|
New Youngs Bay Bridge to Neptune Drive (milepost 5.3-6.8)
Cost and Funding
Design and Construction: $4.6 million