The current Crosel Creek culvert under OR 202 failed during a high-water event in 2016.
We made temporary repairs and are now returning to install a new permanent culvert.
The new culvert will meet current standards and:
- Allow water to flow under the highway, helping to prevent flooding.
- Keep the road passable in storms.
- Help stabilize the embankment.
We'll also install a new road surface and apply permanent striping and guardrails at the new culvert.
Location
OR 202
|
Milepost 3.6
Cost and Funding
Design and construction: $7,751,556
Pedestrians, including those with disabilities, will have access through or around the work zone.