U.S. 26 Paving

Construction Phase

Region 2: Willamette Valley and Northwest Oregon (Clatsop)


​​​​We will repave U.S. 26 from Necanicum Junction at OR 53 to the Nehalem River Bridge.


OOH construction banner

Impacts

Traffic Impact

We will not have full road closures, but expect delays and lane closures.

Construction Impacts

view the interactive map to learn what other projects are constructing this yearIn the two lane sections of the project area travel will be down to one lane and work will be done at night, Sunday night through Friday morning 8 p.m. to 8 a.m. In the four lane sections of the project area, work can be done during either daytime or nighttime hours and we will maintain one travel lane in each direction. 

Construction will start with the guardrails, move to the side streets before starting work on U.S. 26 itself.

There will be a second paving project​ on U.S 26 this summer from mile post 47.6 - 53.

To find out the most up to date impacts, visit TripCheck.​

Learn about other projects that will be constructing this year by viewing our interactive map


​Pedestrians, including those with disabilities, will have access through or around work zones. 

Details

About

​U.S. 26 is a major tourist route from Portland to the Seaside and Cannon Beach areas of the coast. This is also a freight route for the north coast area as well as an important regional route. 
 
The section of roadway between Necanicum Junction at OR 53 to the Nehalem River Bridge is in poor condition.  We will repave the highway, install new striping, signage and stormwater treatment. We will also install new guardrail and modify the existing bridge rails.
 
There will be lanes closures, expect delays. Work can be done during the day or night, the details will be determined after the contract is awarded.
 
Once construction begins, TripCheck.com will have the most up to date information about impacts. 

Schedule

Project expected to construct in 2021.

Location

U.S. 26 |

​Between milepoint 9.8 to 21.6

Cost and Funding

​$15.3 Million 

Contacts & Media

Project Area Map

Project Contacts

Resident Engineer
Jayson Buchholz
Email
jayson.w.buchholz@odot.state.or.us
Phone
503-298-9180

Public Information Officer
Lou Torres
Email
louis.c.torres@odot.state.or.us
Phone
503-986-2880

Get Project Alerts

Sign up for the newsletter!

Last Updated

6/15/2021 11:22 AM

Project Number

21233

Project Documents

Related documents to this project
21233-US26NecanicumNehalem-snapshot.pdfA brief overview of the project with costs and benefits.



Your browser is out-of-date! It has known security flaws and may not display all features of this and other websites. Learn how

×