Project-Details







I-5: Road Repairs (Goshen to Cottage Grove)

Construction Phase

Region 2: Willamette Valley and Northwest Oregon (Lane)


​​​​​​​​​​​​​​​​​We're repairing the road to extend the life of the pavement and to give you a smoother ride. ​


Banner: Slow down, in the work zone it could save lives. Building a modern transportation system to help Oregon’s communities and economy thrive. During construction, Give yourself more time, try a new way or mode to get there or take a different route.

Impacts

Traffic Impact

None at this time. When we return in mid-October for about two weeks, you can expect occasional lane and shoulder closures. 

Construction Impacts

I-5 Construction LogoNone at this time. We'll be back in mid-October for about two weeks. When we return, you can expect:

  • Occasional lane and shoulder closures​.
  • Delays and construction noise.

Construction Activities

In mid-October, we'll complete northbound bridge joint work.

Visit TripCheck​ for the most current traffic information.​


​Pedestrians, including those with disabilities, will have access through or around work zones. ​


work zone construction iconPay attention in the work zone, slow down and move over – imagine this is where you work! 

Always drive safely, watch for construction signs and workers. 

Remember: fines double in all Oregon work zones, whether workers and signs are present or not. ​

Details

About

​​We are making repairs to the road to extend the life of the pavement and make it safer for drivers. 

This section of roadway shows signs of wear, cracking and potholes. Worn roads are less safe for drivers and leads to increased gas and maintenance cost for drivers.

​With this project, we will do maintenance repairs before extensive work is required.  We will:

  • Patch failures in the existing concrete pavement.

  • Resurface asphalt to repair cracking, rutting, and wear.

  • Repair northbound and southbound lanes. 

  • Many ramps in the area will be repaved.

  • Joint work on bridges and bridge deck membrane.​​

Schedule

Design: 2020-2022
Construction: 2023-2024

Location

I-5 |

​Milepost 174.9 to 187.9

Cost and Funding

​$9.2 million

Contacts & Media

Project Area Map

Project Contacts

Resident Engineer – Consultant Projects
Julie GaNung
Email
julie.e.ganung@odot.oregon.gov
Phone
541-726-2578

Public Information Officer
Mindy McCartt
Email
mindy.m.mccartt@odot.oregon.gov
Phone
503-507-6045

Get Project Alerts

Sign up for the newsletter!

Last Updated

10/1/2024 3:21 PM

Project Number

21540