About
We are making repairs to the road to extend the life of the pavement and make it safer for drivers.
This section of roadway shows signs of wear, cracking and potholes. Worn roads are less safe for drivers and leads to increased gas and maintenance cost for drivers.
With this project, we will do maintenance repairs before extensive work is required. We will:
Patch failures in the existing concrete pavement.
Resurface asphalt to repair cracking, rutting, and wear.
Repair northbound and southbound lanes.
Many ramps in the area will be repaved.
Joint work on bridges and bridge deck membrane.
Schedule
Design: 2020-2022
Construction: 2023-2024
Location
I-5
|
Milepost 174.9 to 187.9
Cost and Funding
$9.2 million