U.S. 101 Paving (SE 40th Street to SE 123rd Street)

Project Completed

Region 2: Willamette Valley and Northwest Oregon (Newport, Lincoln)


​​​​​​​​​​​​​​​We repaved to preserve the road and give you a smoother ride.​


Banner: Slow down, in the work zone it could save lives. Building a modern transportation system to help Oregon’s communities and economy thrive. During construction, Give yourself more time, try a new way or mode to get there or take a different route.

Details

About

Enlarged Project Area MapThe pavement in this section of U.S. 101 was in poor condition and needed to be replaced. 

For this project, we:

  • Repaved the road. 
    • This helps reduce maintenance costs and gives you a smoother ride.
  • ​Installed new striping and rumble strips. 
    • Striping helps clearly define each travel lane. Rumble strips provide noise and vibration to alert a driver when they’re leaving their lane.
  • Built ADA curb ramps at SE 40th Street. 
    • ​These curb ramps help make it easier for everyone to move between the curb and road, whether you have a disability or not.

Schedule

Design: 2022 - 2024
Construction: 2024 - 2025

Location

U.S. 101 |

​Milepost 142.5 to 147 | Between SE 40th Street and SE 123rd Street

Cost and Funding

Total cost: $4,844,331​

Contacts & Media

Project Area Map

Project Contacts

Resident Engineer
Steve Schultz
Email
steven.schultz@odot.oregon.gov
Phone
541-757-4211

Public Information Officer
Mindy McCartt
Email
mindy.m.mccartt@odot.oregon.gov
Phone
503-507-6045