The pavement in this section of U.S. 101 was in poor condition and needed to be replaced.
For this project, we:
- Repaved the road.
- This helps reduce maintenance costs and gives you a smoother ride.
- Installed new striping and rumble strips.
- Striping helps clearly define each travel lane. Rumble strips provide noise and vibration to alert a driver when they’re leaving their lane.
- Built ADA curb ramps at SE 40th Street.
- These curb ramps help make it easier for everyone to move between the curb and road, whether you have a disability or not.
Schedule
Design: 2022 - 2024
Construction: 2024 - 2025
Location
U.S. 101
|
Milepost 142.5 to 147 | Between SE 40th Street and SE 123rd Street
Cost and Funding
Total cost: $4,844,331