About
This bridge connects Oregon to Washington and requires continuous maintenance in order to keep it functional. Currently, there are portions of the bridge's driving surface that needs to be repaired.
The purpose of the project is to repair the bridge's driving surface. Work will include bridge surface repair, a structural inlay and concrete crack sealer.

Schedule
Design: 2021 - 2026
Construction: 2026 - 2027
Location
U.S. 101
|
Milepost 3.32 - 3.67
Cost and Funding
Design and construction: $7,624,883
Pedestrians, including those with disabilities, will have access through or around the work zone.