U.S. 20: Central Oregon Highway Corridor Culverts Project

Construction Phase

Region 4: Central Oregon (Bend, Burns, Crook, Deschutes, Harney)


​​Repair or replace 13 culverts on U.S. 20 between mile point 2.95 and mile point 103.25.


https://www-auth.oregon.gov/odot/Projects/Project%20Images/DesignBanner.jpg

Impacts

Construction Impacts

Expect single lane closures during construction.​

Schedule

Design: 2022-2024​

Bid: 10/10/2024​​

Construction: 2025

Details

About

​We will be repairing or replacing 13 culverts on U.S. 20 between mile point 2.95 and 103.25.

Pipe fixes include removal and replacement of all or part of culverts, slip lines, sloped end installations and embankment protection. ​

resize 21756 culvert.JPG


Location

U.S. 20

Cost and Funding

​$1.7 million​

Contractor

​​K&E Excavating 

Benefits

​ODOT is responsible for the maintenance of these culverts as key infrastructure for U.S. 20. The culverts manage surface water flows near the roadway. Maintenance and repairs to the culverts extend the life of the roadway system and increase safety for travelers.​

What Problem Will This Improve?

​​Repairs will address things such as rust, barrel dam​​age, and open joints. A failed culvert can cause safety hazards for travelers and damage the overlaying road pavement. ​

Contacts & Media

Project Contacts

Project Manager
Aron Sturko
Email
aron.sturko@odot.oregon.gov
Phone
541-388-6166

Community Affairs
Meghan Blyth
Email
meghan.l.blyth@odot.oregon.gov
Phone
541-316-3941

Last Updated

10/8/2025 3:22 PM

Project Number

21756