About
We've preserved the bridge that goes over the Tillamook River by:
- Removing the old paint and rust.
- Replacing worn out or damaged bolts and rivets as needed.
- Applying a new coat of paint.
This work was important for the health and longevity of the bridge.
Schedule
Design: 2021-2024
Construction: 2025
Location
OR 131
|
Milepost 7.5
Cost and Funding
Design and construction: $1,913,422