U.S. 101: Gold Beach (Rogue River) Bridge

Design Phase

Region 3: Southwestern Oregon (Gold Beach, Curry)


​​​This project will protect the Gold Beach Bridge from corrosion by replacing the cathodic protection system that was first applied to the bridge’s concrete arches more than two decades ago.​


Impacts

Construction Impacts

​Most construction will take place below the deck (roadway surface) of the bridge.

Work hours: Most work will take place during daytime hours, though there may be some nighttime noise.

Traffic: Some nighttime lane closures may be necessary. Flaggers will provide traffic control as needed.

Pedestrian: At least one sidewalk will remain open at all times.

River: Maritime traffic will be able to pass under at least one span of the bridge at all times.


Schedule

​Bid let date: Sept. 17, 2026.

Construction is likely to begin during the winter of 2026-27. All work is scheduled to be completed by May 31, 2031.



Details

About

​The bridge opened in 1932 and was officially named the Isaac Lee Patterson Memorial Bridge in honor of the 18th governor of Oregon, who died in office in 1929. It is commonly known as the Gold Beach Bridge or the Rogue River Bridge.

The lead designer of the bridge was Conde B. McCullough, who is responsible for many of Oregon’s most iconic bridges of the 1920s and 1930s.

The bridge is 1,898 feet in length, and contains two travel lanes and two sidewalks.

In 2020, a one-year project performed structural repairs, strengthened beams, repaired deck joints, and resurfaced the travel lanes.

In 2001, a three-year rehabilitation project applied a cathodic protection system to the concrete arches of the bridge to help prevent corrosion.


Problem and solution

Like many other bridges along the Oregon coast, the steel in the concrete arch spans is vulnerable to corrosion from the harsh marine air. The cathodic protection system installed in 2001-04 is nearing the end of its design life. Without replacement of the system, the steel in the concrete arches will be vulnerable to corrosion.

This project will replace the existing cathodic protection system on the bridge.​



Location

U.S. 101 |

​The Gold Beach Bridge spans the Rogue River and is located along U.S. 101 (Oregon Coast Highway) at milepost 327.5-327.9 in Curry County. The City of Gold Beach is located south of the bridge and the community of Wedderburn is at the north end.

Bridge camera

ODOT has installed a TripCheck​ camera along the north bank of the Rogue River that overlooks the Gold Beach Bridge. The camera takes a new photo every 5-10 minutes.


U.S. 101 at Gold Beach Bridge


Cost and Funding

Estimated project cost through construction: $42,340,000.


Contractor

Contractor to be determined after bid.


Contacts & Media

Project map

Image Gallery

Project Contact

Public Information Officer
Dan Latham
Email
Dan.Latham@odot.oregon.gov
Phone
541-817-5200

Get Project Alerts

ODOT Facebook

Last Updated

9/30/2026 5:13 PM

Project Number

21769