Project-Details







Cornelius Pass Hwy & U.S. 30 ITS Improvements

Design Phase

Region 1: Portland metro and Hood River County (Various Cities, Multnomah, Washington)


​​​The Cornelius Pass Hwy & U.S. 30 ITS Improvements Project focuses on making Cornelius Pass Highway (Highway 127), between U.S. 26 and U.S. 30, safer and more efficient for travelers. The project includes upgrades to lighting, signal equipment, and signage, as well as new intelligent transportation system (ITS) devices such as traffic cameras, variable message signs, and an activated intersection warning system, bringing it up to the latest Oregon Department of Transportation (ODOT) standards.​ 


Impacts

Construction Impacts

Construction in the project area is designed to minimize disruptions for travelers. During the construction phase, travelers can expect:
  • Overnight Work - Likely taking place from 9:00 p.m. to 5:00 a.m., nighttime travel lane closures take advantage of lower traffic volumes to reduce delays.
  • Single Lane Closures - Only one lane will be closed at a time to avoid full roadway closures and detours.
  • Flagging at Signals - Flaggers will be on-site during active construction.
  • Shoulder Closures - Temporary shoulder closures may be utilized during various construction activities that occur just off of the roadway.​

Schedule

  • December 2024 - Winter 2025: Public awareness and outreach 

  • Late 2025 - Early 2026 (TBC): Construction​
Timelines are estimated and will be updated throughout the course of the project.

Details

About

The Cornelius Pass Hwy & U.S. 30 ITS Improvements Project focuses on making Cornelius Pass (Highway 127), between U.S. 26 and U.S. 30, safer and more efficient for travelers.​ The project includes upgrades to lighting, signal equipment, and signage, as well as new intelligent transportation system (ITS) devices such as traffic cameras, variable message signs, and an activated intersection warning system, bringing it up to the latest Oregon Department of Transportation (ODOT) standards.​

El proyecto de mejoras del Sistema Inteligente de Transporte (ITS por sus siglas en inglés) para la carretera Cornelius Pass y la ruta US 30 tiene como objetivo que la carretera 127, entre la US 26 y la US 30, sea más segura y más eficiente para los usuarios. El proyecto incluye nuevos letreros electrónicos de mensajes variables, actualizaciones a los semáforos y luces de la calle, nuevas cámaras para el tránsito, un nuevo sistema de alerta activado para intersecciones (AIWS por sus siglas en inglés) y delineadores y letreros actualizados a lo largo de la carretera. Para reducir los retrasos en el tránsito durante el día, la construcción se realizará durante la noche con cierres temporales y limitados a un solo carril. Se espera que las obras de comiencen en invierno de 2026. 

​科尼利厄斯通道公路及美國 30 號公路智慧型運輸系統改善計畫 (The Cornelius Pass Highway & U.S. 30 ITS Improvements Project),專注於提升介於美國 26 號公路與美國 30 號公路之間的 127 號公路的行旅安全與效率。 計畫內容包括設置新的變數資訊標誌、更新交通號誌燈頭及路燈、安裝新的交通攝影機、新增啟動式交叉路口警示系統,以及更新沿路分隔標誌與標示牌。 為降低日間行車延誤,施工將於夜間進行,屆時單向車道將實施封閉。 施工作業預計最早將於 2026 年冬季啟動。

Location

Multiple |

Cornelius Pass U.S. 26 to U.S. 30​

Cost and Funding

​Estimated project cost through construction: $4,525,582.00.

Benefits

  • ​New Variable Message Signs (VMS) - New and upgraded VMS throughout the project area will enhance communication by providing real-time updates on the corridor, enabling ODOT to communicate more effectively with travelers. Locations include:
    • New VMS on Cornelius Pass Highway near the U.S. 26 off-ramp.
    • Upgraded VMS on U.S. 30 eastbound, just east of Cornelius Pass Highway, will be replaced with a modern system.
    • New VMS on U.S. 30 westbound, just east of Cornelius Pass Highway, will be added.
  • Update existing traffic signal heads - New signal heads with reflectorized backplates will be added to all signals to improve visibility for travelers. 
  • Update existing street lights - Street lights will be upgraded to LED bulbs to improve visibility and pedestrian safety. 
  • New cameras - New Cameras will enhance system operations and provide real-time road updates via ODOT’s traveler information portal, TripCheck.com​.
  • New Activated Intersection Warning System - A flashing beacon on Cornelius Pass will alert drivers of cars entering the road from Skyline Boulevard. This system enhances safety for all travelers without altering the existing intersection function. 
  • Replace road markers - New road markers​ along the corridor will enhance nighttime visibility, helping drivers better navigate the road.​
  • Update Signs - Signs along the corridor will be updated to improve visibility.

Additional Information

​For ADA Title II or Civil Rights Title VI accommodations, translation/interpretation services or for additional information call 503-731-4128, TTY (800) 735-2900 or use the statewide Oregon Relay Service: 7-1-1.

¿Habla ustéd español? Podemos proveer la información en esta publicación en español. Para recibir la información en español, por favor llamé al (503) 731-4128.

Contacts & Media

Map of the Cornelius Pass Highway project area showing improvements planned from U.S. 26 to U.S. 30.

Project Contact

Community Affairs Coordinator
Ellen Waters
Email
Ellen.WATERS@odot.oregon.gov
Phone
503-731-4812

Last Updated

10/14/2025 10:20 AM

Project Number

22421