U.S. 97 and U.S. 20 Curb Ramps (Bend & Sisters)

Construction Phase

Region 4: Central Oregon (Bend, Sisters, Deschutes)


​​​​​​​​​​​​​​​​​​​​​​​​Design and construct curb ramps to meet compliance with the Americans with Disabilities ACT (ADA) standards on state highways at various locations in Bend and Sisters.​


design banner

Impacts

Construction Impacts

Most work will take place overnight to help reduce traffic delays during the day. During construction, nearby residents and businesses may notice construction noise and temporary lane restrictions.​ 

Construction Report (March 27- April 3)

  • BEND:  Crews will be removing and installing new curb ramps along U.S. 20 at NE Arnett Way, NE Azure Drive, NE Benson Way, and NE Dalton Way. Single lane closures will be used during both day and night shifts, but most work will take place overnight between 7 p.m. and 7 a.m. to help minimize daytime traffic impacts. Nearby residents should expect nighttime construction noise.
  • SISTERS: Construction is anticipated to begin the evening of Sunday, March 29, starting with curb ramps at Cascade Street and working west along the North side of U.S. 20.  Work will take place overnight between 7 p.m. and 7 a.m. to help reduce traffic delays during the day. Nearby residents and businesses may notice construction noise.

ProjectUpdates-Click_w-01.png

Schedule

Design: 2022-2024

Bid Let: March 27, 2025

Construction: March 2026- December 2026

*construction schedules are weather dependant and subject to chage without notice

Details

About

This project is part of our strategy to improve accessibility by correcting non-ADA compliant curb ramps and signalized intersections on state highway segments in the communities of Sisters and Bend.  

The project will enhance accessibility, safety, and connectivity of pedestrian crossings at both signalized and non-signalized intersections and at mid-block crossings by upgrading existing curb ramps, altering pedestrian signals, and constructing missing curb ramps. ​

Location

Multiple |

The project includes various locations throughout Deschutes County in the communities of Sisters and Bend. 

SISTERS

  • ​W Rail Way, Barclay Drive, and through downtown on U.S. 20. 

map of project locations in Sisters ​Sisters Project Vicinity Map

                                                                                                                                                                        


​BEND:  

  • On U.S. 20 beginning at Arnett Way continuing east to Dalton Street on the east side of town.

map of project locations in Bend hwy 20 

Map of East Bend- U.S. 20 locations

  • On U.S. 20 at Nels Anderson Road on the north end of town, and Powers Road on the south end of town. U.S. 97 at ​Butler Market Road.
map of project locations in Bend
Map of ​Bend Locations North/South Ends

Cost and Funding

$8,813,250.34.​​​

Contractor

Brown Contracting, Inc.

Benefits

​People with disabilities and everyone who uses sidewalks along the highway will benefit from the curb ramp upgrades.​

Contacts & Media

Project Contacts

Senior Construction Specialist
Haydon Gillies
Email
Haydon.Gillies@odot.oregon.gov
Phone
541-527-2089

Community Affairs
Meghan Blyth
Email
meghan.l.blyth@odot.oregon.gov
Phone
541-316-3941

Last Updated

3/27/2026 3:56 PM

Project Number

22442