About
Much of the guardrail in Oregon is outdated. There are several locations along our highways where the guardrail at bridge ends is either missing or is not connecting.
For this project, we are:
- Upgrading the outdated guardrail along OR 6.
- Installing new guardrail at bridge ends where it is missing.
- Replacing curb ramps at the bridge between Mills Bridge Road and Pete Street to make them ADA compliant.
Guardrail helps lessen the severity of a crash and makes the roads safer for drivers.
Schedule
Design: 2023-2025
Construction: 2026
Location
OR 6
|
Milepost 0 - 51.5
Cost and Funding
Design and construction: $10,385,753