On OR 22, between Beck Road and Brown Road, there are two failing culverts that need to be repaired or replaced.
A culvert allows water to pass under the highway. This helps keep water and debris from collecting on the roadway.
We're planning to:
Repair or replace the existing culverts.
Stabilize the stream bed.
Remove some vegetation and trees near the road.
By repairing or replacing these failing culverts, we'll make the road safer and more stable which will reduce maintenance costs. This could also help the stream to flow better, making it easier for fish to pass through the area.
We're
designing this project but are not yet funded for construction.
Schedule
Design: 2022-2025
Construction: Not currently scheduled
Location
OR 22
|
Mileposts 7.70 and 7.76, between Beck Road and Brown Road
Cost and Funding
Design: $715,000
Construction: Not currently funded.