OR 126 Huston Road to Lakeside Drive Safety Improvements

Design Phase

Region 2: Willamette Valley and Northwest Oregon (Veneta, Lane)


​​​​​​​​​​​​We're making safety improvements in Veneta.


Banner image: Designing a Modern Transportation System and Investing in Oregon’s Future.

Details

About

The intersections in the project area have had a high number of crashes and fatalities. Due to the volume of traffic in this area, installing roundabouts and a left-turn lane is the safest option.

According to the Federal Highway Administration, roundabouts are safer than traditional intersections. Locations with roundabouts see fewer fatalities, injuries and crashes. Other benefits include lower maintenance costs and increased fuel efficiency. 

With the initial project funding, we started to design a roundabout at the OR 126 and Huston Road intersection. 

We received a $30 million grant for OR 126 safety improvements in the project area. The grant was awarded on 1/10/2024. An agreement has not been signed and funds have not been obligated. Learn more information and check in on the status by visiting our Federal Executive Actions webpage.

Project area map highlighting intersections we'll work onOnce we receive the federal funding, we'll continue design and construction to:

  • Install roundabouts at the Huston Road and Ellmaker Road intersections. Installing a roundabout at a rural stop-controlled intersection can reduce fatal and injury crashes by as much as 82%. 
  • Install a left-turn lane at Lakeside Drive.
  • Widen the shoulders and install a two-way left turn lane between Huston and Ellmaker Roads.
  • Build a separated multi-use path on the north side of the highway between Huston and Lakeside Drive.
  • Upgrade the rail crossing at Huston Road with concrete panels, turn lanes and new rail crossing equipment.​

Schedule

Design: 2022-2027
Construction: Not currently scheduled

Location

OR 126 |

Florence-Eugene Highway | Milepost 47.7-49.68

Cost and Funding

​Design: $1,400,000​

​Construction: Not currently funded​​


​Pedestrians, including those with disabilities, will have access through or around the work zone.


Project information may differ from what is published on the Transportation Project Tracker, which pulls from a system updated quarterly as changes are approved.

Contacts & Media

project area map

Project Contacts

Transportation Project Manager
Molly Cary
Email
molly.a.cary@odot.oregon.gov
Phone
503-508-3679

Public Information Officer
Mindy McCartt
Email
mindy.m.mccartt@odot.oregon.gov
Phone
503-507-6045