About
Downtown Corvallis is a busy area whether you drive, ride, walk or roll. The traffic signals at these two intersections are in poor condition and need to be upgraded.
We plan to:
- Replace the signals.
- Build sidewalks in the project area.
- Pave SW Western Boulevard between SW 4th Street and SW 3rd Street.
- Apply permanent striping.
- Make the curb ramps at the intersections ADA-compliant.
Our partners will move utility lines to prepare for construction.
Schedule
Design: 2023-2026
Construction: 2027
Location
OR 99W
|
Milepost 83.9
Cost and Funding
Design and construction: $4,686,541
Pedestrians, including those with disabilities, will have access through or around the work zone.