The bridge approaches and bridge decks need repairs and
upgrades to the wearing surfaces. An existing deck seal is losing its effectiveness, allowing moisture to penetrate the surface and reducing the driving surface lifespan.
Location
I-84
|
Mileposts 207 and 209.
- Rieth Highway and Union Pacific Railroad bridges:
- Eastbound, milepost 208.
- Westbound, milepost 208.
- Umatilla River bridges:
- Eastbound, milepost 209.
- Westbound, milepost 209.
Cost and Funding
The estimated project cost through construction is $13.3 million.
Benefits
Bridge deck and approach slab preservation work will improve driver safety, decrease traffic disruptions for maintenance work and extend the service life of the bridges.