Skip to main content

Oregon State Flag An official website of the State of Oregon »

Project-Details



I-84: Rieth Interchange and Umatilla River Bridges

Design Phase

Region 5: Eastern Oregon (Umatilla)


​​​​​​​​​​​​​​​​​​We will repair four bridges. Work includes repairing deck surfaces and approaches, and installing new joints. These repairs will extend the life of the structures. 


Impacts

Traffic Impact

​No tra​ffic impacts at this time.

Construction Impacts

​To prepare for and safely accommodate work on the bridges in 2027, we will construct crossovers in 2026.
  • Crossovers reduce traffic to a single lane in each direction by shifting traffic from one side of a divided road to the other side that is not under construction.
  • Crossovers protect workers from live traffic, reduce conflicts by giving workers more room and require fewer setups and removals of traffic control devices during construction.

Schedule

​The project has been awarded. Schedule will be available soon.
Construction is anticipated to begin late summer to build traffic crossovers. Bridge repairs will take place in 2027.

Details

About

​The bridge approaches and bridge decks need repairs andEnlarged project map. upgrades to the wearing surfaces. An existing deck seal is losing its effectiveness, allowing moisture to penetrate the surface and reducing the driving surface lifespan.

Location

I-84 |
Mileposts 207 and 209.
  • Rieth Highway and Union Pacific Railroad bridges:
    • Eastbound, milepost 208.
    • Westbound, milepost 208.
  • Umatilla River bridges:
    • Eastbound, milepost 209.
    • Westbound, milepost 209.​

Cost and Funding

​The estimated project cost through construction is $13.3 million.​

Benefits

​Bridge deck and approach slab preservation work will improve driver safety, decrease traffic disruptions for maintenance work and extend the service life of the bridges.

Contacts & Media

The Umatilla River Bridge near milepost 209.

Project Contact

Community Affairs Specialist
Vicki L Moles
Email
vicki.l.moles@odot.oregon.gov
Phone
541-620-4527

Get Project Alerts

Sign up for the newsletter!

Last Updated

5/29/2026 12:05 PM

Project Number

22855