About
We are replacing and upgrading equipment that is beyond its service life in the Portland area. Improvements include replacing variable message signs (VMS), improving sign structures, and restriping. This work helps us maintain operations of the transportation system and supports a smoother and safer ride for travelers.
Replacing VMS signs
We are replacing three VMS signs on I-5. Crews will be removing and installing signs over lanes of traffic, so closures are needed to provide a safe environment for workers and the traveling public.
The closures will take place from 1 a.m. to 5 a.m., for up to two nights at each location. Work will be sequenced so that only one section of I-5 is closed at a time. Signed detour routes will be in place to help travelers get around the closures.
Neighbors may hear some minor construction noise during the overnight work. However, no unusual levels of noise, dust, vibration, or lighting are expected.
Location
I-5Cost and Funding
$1.67 million
Benefits
- Improved reliability: Replacing equipment that is beyond its service life helps keep transportation equipment working reliably.
- Safer, smoother travel: Improving lane striping will help increase lane visibility and maintain a safer, smoother travel experience for drivers.