I-84: Bridges over North Spruce Street (La Grande)

Design Phase

Region 5: Eastern Oregon (La Grande, Union)


We will repave bridge decks and approach slabs, replace joints, and rebuild roadway transition panels.​


Impacts

Schedule

​Project design 2024-2026.
Project bids June 2026.
Construction 2026-2027.

  • Crossovers will be constructed in 2026.
  • Bridge work in 2027.​

Details

About

Map of project area.We are designing a project to repair two bridges on I-84 over Spruce Street in La Grande. We will repair deck surfaces and bridge approaches that are in poor condition and have failed connections. We will install new joints and rebuild transitions from the road to the bridge. These repairs will extend the life of the structures and provide a smooth and safer ride.

To prepare for and safely accommodate work on the bridge in 2027, we will construct crossovers in 2026.
Crossovers reduce traffic to a single lane in each direction by shifting traffic from one side of a divided road to the other side that is not under construction.
Crossovers protect workers from live traffic, reduce conflicts by giving workers more room and require fewer setups and removals of traffic control devices during construction.

Location

I-84 |

​Milepost 261, westbound and eastbound; over North Spruce Street.

Cost and Funding

​The estimated project cost through construction is $8.8 million.​

Benefits

​Bridge deck and approach slab preservation work will improve driver safety, decrease traffic disruptions for maintenance work and extend the service life of the bridges.

Additional Information

​Example of damaged approach slab.

Example of damaged approach slab.

Contacts & Media

Project Contact

Community Affairs Specialist
Vicki L Moles
Email
vicki.l.moles@odot.oregon.gov
Phone
541-620-4527

Get Project Alerts

Sign up for the newsletter!

Last Updated

8/12/2025 9:58 AM

Project Number

22930